{"title":"PENGEMBANGAN JARINGAN TRANSMISI 150 KV BALI BERDASARKAN RENCANA UMUM KETENAGALISTRIKAN DAERAH (RUKD) PROVINSI BALI TAHUN 2022 – 2030","authors":"I. G. Evan Aditya Pramana, W. G. Ariastina, I. W. Sukerayasa","doi":"10.24843/spektrum.2023.v10.i01.p3","DOIUrl":null,"url":null,"abstract":"The need for electrical energy increases every year. That is linear with the economic growth that happens in the area. Bali is an area where the demand for electrical energy has increased significantly throughout the year. The increase in electrical energy demands will cause the power peak load to increase as well. It's necessary to develop a 150 kV transmission system to anticipate peak load from reaching the breakdown point of the transmission system. Based on this study, the transmission line from Kapal Substation to Pemecutan Klod Substation experienced 80.1% of the maximum load capacity of the line in 2029. It means that the load flow has exceeded the ideal loading of the transmission line, which is 80% of its maximum capacity. Uprating the conductor from TACSR 240 mm2 to ACCC Lisbon 310 mm2 and adding a new circuit line, will help the transmission line sustainable until 2046 before reaching 100% of its maximum capacity.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i01.p3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The need for electrical energy increases every year. That is linear with the economic growth that happens in the area. Bali is an area where the demand for electrical energy has increased significantly throughout the year. The increase in electrical energy demands will cause the power peak load to increase as well. It's necessary to develop a 150 kV transmission system to anticipate peak load from reaching the breakdown point of the transmission system. Based on this study, the transmission line from Kapal Substation to Pemecutan Klod Substation experienced 80.1% of the maximum load capacity of the line in 2029. It means that the load flow has exceeded the ideal loading of the transmission line, which is 80% of its maximum capacity. Uprating the conductor from TACSR 240 mm2 to ACCC Lisbon 310 mm2 and adding a new circuit line, will help the transmission line sustainable until 2046 before reaching 100% of its maximum capacity.
根据巴厘岛总供电计划,到2022年至2030年,输电网络发展到150 KV
对电能的需求每年都在增加。这与该地区的经济增长呈线性关系。巴厘岛是一个全年对电能需求显著增加的地区。电能需求的增加也会导致电力峰值负荷的增加。有必要开发150kv输电系统,从达到输电系统击穿点开始预测峰值负荷。根据本研究,2029年Kapal变电站至Pemecutan Klod变电站的输电线路达到该线路最大负荷容量的80.1%。即负载流超过了输电线路的理想负荷,即其最大容量的80%。将导体从TACSR 240 mm2升级到ACCC里斯本310 mm2,并增加一条新的线路,将有助于传输线可持续到2046年,然后达到其最大容量的100%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信