Driving Superior Performance in Brazilian Pre-Salt - The Challenges, Solutions and Achievements of Shell and Providers in Exploratory Pre-Salt Wells in Brazil

Enrique Barrios, Rafael Santos, Robin P. Hartmann, Vinícius Pessanha, R. Neves, Rodrigo Alves Pereira, Rodrigo Rodrigues Ribeiro, Thiago Schimmelpfennig
{"title":"Driving Superior Performance in Brazilian Pre-Salt - The Challenges, Solutions and Achievements of Shell and Providers in Exploratory Pre-Salt Wells in Brazil","authors":"Enrique Barrios, Rafael Santos, Robin P. Hartmann, Vinícius Pessanha, R. Neves, Rodrigo Alves Pereira, Rodrigo Rodrigues Ribeiro, Thiago Schimmelpfennig","doi":"10.4043/31004-ms","DOIUrl":null,"url":null,"abstract":"\n The Brazilian Pre-Salt has gained importance as an essential world-class province given its prolific production and thanks to its many challenges, it has incentivized the market to look for better ways to faces these technical challenges safely. This article aims to describe the main challenges faced by Shell and Constellation as well as the approach adopted to improve the operations’ safety and reduce drilling time, significantly reducing the drilling costs in an exploratory campaign in the Brazilian Pre-Salt.\n The campaign was based on the buildup of a partnership between the drilling contractor, operator and the main services provider, Halliburton, creating a transparent and collaborative environment, which improved all parties’ ownership and accountability. The application of many processes and techniques such as Step Seven, Stop Work Authority and Design of Work improved safety and efficiency. A precise equipment selection, detailed planning and careful execution with disciplined application of a learning mindset were also paramount to drilling performance.\n Four pre-salt wells were drilled in the campaign at Sul de Gato de Mato (2 wells), Alto de Cabo Frio and Saturno prospects with all of them qualifying in terms of drilling time as best in class (BIC), i.e., within the top 5% percentile. In 2019, the GdM3 well was the fastest delivery of a pre-salt well out of the 250+ wells in the region. The well GdM4 drilled in 2020 as part of the same campaign broke the previous record by seven days, being the fastest pre-salt well ever drilled with its 18 dry hole days mark.\n The main reason associated with the campaign´s success was the utilization of the DID-PDCA methodology, which promoted the integration of all the workforce in a cycle towards continuous improvement by: (i) carefully selecting the equipment and experienced service providers, (ii) generating detailed plans of the drilling activity and engaging all those involved in the delivery, (iii) establishing and applying a HSE strategy for safety culture enhanced and (iv) constantly monitoring of performance and discussing the next steps.\n Along this article a summary of well layout, the drilling phase duration, some of the key performance improvement initiatives as well as how they were generated will be shared.","PeriodicalId":11084,"journal":{"name":"Day 4 Thu, August 19, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, August 19, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31004-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Brazilian Pre-Salt has gained importance as an essential world-class province given its prolific production and thanks to its many challenges, it has incentivized the market to look for better ways to faces these technical challenges safely. This article aims to describe the main challenges faced by Shell and Constellation as well as the approach adopted to improve the operations’ safety and reduce drilling time, significantly reducing the drilling costs in an exploratory campaign in the Brazilian Pre-Salt. The campaign was based on the buildup of a partnership between the drilling contractor, operator and the main services provider, Halliburton, creating a transparent and collaborative environment, which improved all parties’ ownership and accountability. The application of many processes and techniques such as Step Seven, Stop Work Authority and Design of Work improved safety and efficiency. A precise equipment selection, detailed planning and careful execution with disciplined application of a learning mindset were also paramount to drilling performance. Four pre-salt wells were drilled in the campaign at Sul de Gato de Mato (2 wells), Alto de Cabo Frio and Saturno prospects with all of them qualifying in terms of drilling time as best in class (BIC), i.e., within the top 5% percentile. In 2019, the GdM3 well was the fastest delivery of a pre-salt well out of the 250+ wells in the region. The well GdM4 drilled in 2020 as part of the same campaign broke the previous record by seven days, being the fastest pre-salt well ever drilled with its 18 dry hole days mark. The main reason associated with the campaign´s success was the utilization of the DID-PDCA methodology, which promoted the integration of all the workforce in a cycle towards continuous improvement by: (i) carefully selecting the equipment and experienced service providers, (ii) generating detailed plans of the drilling activity and engaging all those involved in the delivery, (iii) establishing and applying a HSE strategy for safety culture enhanced and (iv) constantly monitoring of performance and discussing the next steps. Along this article a summary of well layout, the drilling phase duration, some of the key performance improvement initiatives as well as how they were generated will be shared.
推动巴西盐下井的卓越性能——壳牌和供应商在巴西盐下井勘探中的挑战、解决方案和成就
由于巴西盐下油藏产量丰富,其作为世界级油田的重要性日益凸显,同时也面临着诸多挑战,这促使市场寻找更好的方法来安全地应对这些技术挑战。本文旨在描述壳牌和Constellation公司面临的主要挑战,以及在巴西盐下勘探活动中为提高作业安全性、缩短钻井时间、显著降低钻井成本所采取的方法。该活动建立在钻井承包商、运营商和主要服务提供商哈里伯顿之间的合作伙伴关系的基础上,创造了一个透明和协作的环境,提高了各方的所有权和问责制。许多流程和技术的应用,如第七步、停止工作权限和工作设计,提高了安全性和效率。精确的设备选择、详细的规划、仔细的执行以及严谨的学习心态对钻井性能也是至关重要的。在Sul de Gato de Mato(2口井)、Alto de Cabo Frio和Saturno区块,共钻了4口盐下井,所有井的钻井时间都达到了同类最佳(BIC)水平,即在前5%的范围内。2019年,GdM3井是该地区250多口井中交付速度最快的一口盐下井。作为同一活动的一部分,2020年钻探的GdM4井将之前的记录提前了7天,成为有史以来钻探速度最快的盐下井,达到了18个干井日。活动成功的主要原因是使用了DID-PDCA方法,该方法通过以下方式促进了所有劳动力在持续改进周期中的整合:(1)仔细选择设备和经验丰富的服务提供商,(2)制定钻井活动的详细计划,并让所有参与交付的人员参与进来,(3)建立和应用HSE战略,以加强安全文化,(4)不断监测性能并讨论下一步。在这篇文章中,我们将总结井的布局、钻井阶段的持续时间、一些关键的性能改进措施以及它们是如何产生的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信