Urban Planning Creates Value for a Highly Congested Field in Sultanate of Oman

Abid Hussain, A. Ghufaili, Chaitanya Behera
{"title":"Urban Planning Creates Value for a Highly Congested Field in Sultanate of Oman","authors":"Abid Hussain, A. Ghufaili, Chaitanya Behera","doi":"10.2118/197225-ms","DOIUrl":null,"url":null,"abstract":"\n This paper discusses the urban planning process applied for field development of one of the biggest and most congested field in sultanate of Oman. The field has a carbonate reservoir contains a light oil with associated gas. The reservoir is currently under waterflood development. The oil production is co-mingled with other fields at production station and the produced water is pumped back into the reservoir for pressure maintenance and the remaining is disposed into another reservoir. The field contains an area layout of 22 km °18 km. The new development proposal of further infill drilling at a narrower spacing was challenging in term of well interference with existing infrastructure, spacing, rig movement and accessibility.\n The first pass of checking the wells locations feasibility shows that only 30 percent of the wells can be drilled due to massive amount of existing wells with surface infrastructure. It was not easy to develop and drill the majority of proposed wells with required surface infrastructure. A detailed urban planning study was carried out to address the inherent issues and challenges associated with re-development of the field. An integrated multi-discipline team was formulated consisting of, Concept Engineering, Geomatics, Production Geologist, Reservoir Engineering and Well Engineering. A close coordination was also maintained with other relevant disciplines to address the surface development issues and for making the quality concept decisions in early phase of the project. The process of urban planning applied in this study was documented as a best practice within the company and cross learnings were used as basis during the study and also captured in Urban Planning Guideline which was developed internally.\n Resolving the challenges for placement of wells on surface and rig accessibility for drilling challenged the normal ways of working and triggered the un-conventional thinking to establish the well drilling feasibility and integration with surface scope. Consequently, project team have come up with ways to drill the wells that would not be drilled by following the normal way of working. Integrated urban planning enabled the proposed number of wells to be drilled despite the insufficient space to accommodate standard pits and pads. In conventional approach, initial urban planning assessment concluded feasibility of drilling only 30 percent of proposed wells. However, the team managed to improve the feasibility of drilling those wells up to 90 percent. This has allowed the maturation of the planned target hydrocarbon volume and created huge value in re-development of this field. Tangible benefits also achieved in early decision-making, up to two months schedule acceleration could be realized in field development through integrated urban planning approach. Study has demonstrated that urban planning can save approximately 10 percent in off-plot CAPEX. On top of this, urban planning has helped in lowering HSE risks during the drilling and reducing production deferment during construction.","PeriodicalId":11061,"journal":{"name":"Day 1 Mon, November 11, 2019","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 11, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197225-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper discusses the urban planning process applied for field development of one of the biggest and most congested field in sultanate of Oman. The field has a carbonate reservoir contains a light oil with associated gas. The reservoir is currently under waterflood development. The oil production is co-mingled with other fields at production station and the produced water is pumped back into the reservoir for pressure maintenance and the remaining is disposed into another reservoir. The field contains an area layout of 22 km °18 km. The new development proposal of further infill drilling at a narrower spacing was challenging in term of well interference with existing infrastructure, spacing, rig movement and accessibility. The first pass of checking the wells locations feasibility shows that only 30 percent of the wells can be drilled due to massive amount of existing wells with surface infrastructure. It was not easy to develop and drill the majority of proposed wells with required surface infrastructure. A detailed urban planning study was carried out to address the inherent issues and challenges associated with re-development of the field. An integrated multi-discipline team was formulated consisting of, Concept Engineering, Geomatics, Production Geologist, Reservoir Engineering and Well Engineering. A close coordination was also maintained with other relevant disciplines to address the surface development issues and for making the quality concept decisions in early phase of the project. The process of urban planning applied in this study was documented as a best practice within the company and cross learnings were used as basis during the study and also captured in Urban Planning Guideline which was developed internally. Resolving the challenges for placement of wells on surface and rig accessibility for drilling challenged the normal ways of working and triggered the un-conventional thinking to establish the well drilling feasibility and integration with surface scope. Consequently, project team have come up with ways to drill the wells that would not be drilled by following the normal way of working. Integrated urban planning enabled the proposed number of wells to be drilled despite the insufficient space to accommodate standard pits and pads. In conventional approach, initial urban planning assessment concluded feasibility of drilling only 30 percent of proposed wells. However, the team managed to improve the feasibility of drilling those wells up to 90 percent. This has allowed the maturation of the planned target hydrocarbon volume and created huge value in re-development of this field. Tangible benefits also achieved in early decision-making, up to two months schedule acceleration could be realized in field development through integrated urban planning approach. Study has demonstrated that urban planning can save approximately 10 percent in off-plot CAPEX. On top of this, urban planning has helped in lowering HSE risks during the drilling and reducing production deferment during construction.
阿曼苏丹国城市规划为高度拥挤的地区创造价值
本文讨论了阿曼苏丹国最大和最拥挤的油田之一的油田开发的城市规划过程。该油田为碳酸盐岩油藏,含轻质油和伴生气。该油藏目前正在注水开发中。在采油站,采出油与其他油田混合,采出水被泵回储层维持压力,剩余的水被排入另一个储层。该油田面积为22 km°18 km。新的开发建议是在更窄的间距上进行进一步的填充钻井,这对现有基础设施、间距、钻机移动和可达性的井干扰具有挑战性。对井位可行性的第一轮检查表明,由于现有的大量井具有地面基础设施,因此只有30%的井可以钻探。对于大多数具有必要地面基础设施的井来说,开发和钻井并不容易。进行了详细的城市规划研究,以解决与该领域重新开发相关的固有问题和挑战。组建了一个由概念工程、地质信息、生产地质学、油藏工程和井工程组成的综合多学科团队。与其他有关学科保持密切协调,以处理地面发展问题,并在项目的早期阶段作出质量概念决定。本研究中应用的城市规划过程被记录为公司内部的最佳实践,交叉学习在研究期间被用作基础,并在内部制定的《城市规划指南》中得到了体现。解决了地面钻井布置和钻机可达性的挑战,挑战了常规的工作方式,引发了建立钻井可行性和与地面范围整合的非常规思维。因此,项目团队提出了按照正常工作方式钻不出的井的方法。尽管没有足够的空间来容纳标准的坑和垫,但综合城市规划使所提出的钻井数量得以实现。在传统方法中,最初的城市规划评估得出的结论是,只有30%的拟钻井是可行的。然而,该团队设法将钻井的可行性提高到90%。这使得计划的目标油气体积成熟,并为该油田的再开发创造了巨大的价值。在早期决策方面也取得了切实的效益,通过综合城市规划方法在实地开发中可实现长达两个月的进度加速。研究表明,城市规划可以节省大约10%的非地块资本支出。最重要的是,城市规划有助于降低钻井期间的HSE风险,减少施工期间的生产延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信