Analisis Kinerja Biaya dan Waktu dengan Metode Earned Value pada Proyek Transportasi Bandar Udara

Isfan Dina, Budi Susetyo, Agus Suroso
{"title":"Analisis Kinerja Biaya dan Waktu dengan Metode Earned Value pada Proyek Transportasi Bandar Udara","authors":"Isfan Dina, Budi Susetyo, Agus Suroso","doi":"10.21776/ub.rekayasasipil.2023.017.03.4","DOIUrl":null,"url":null,"abstract":"The Ministry of Transportation plans to build 16 national strategic airports by 2021. The airports to be built are spread from Sumatra to Papua with a total budget of IDR 1.6 trillion. Projects that are complex and dynamic in their implementation have caused many projects not to go according to plan. Both in terms of time, cost and labor. For this reason, it is necessary to have a consistent and integrated control mechanism for project performance. Earned Value Management (EVM) is one of the appropriate project management techniques used to compare actual work performance against project plans. Outline of project control can identify such as: Time and Schedule ; Is the time used to be longer or faster than the original plan? then, Budget and Costs; Does the budget used exceed the initial budget that has been determined or not, and Performance; Does performance lead to real productivity at the time of reporting? The results of the study explain that in weeks 9 to 12 the SPI value < 1 which indicates that the project is experiencing delays, and starts on schedule in week 13 and accelerates in week 14 while in weeks 15 and 16 it experiences delays again because the value SPI < 1 and back on schedule in week 17. Meanwhile, based on the value of the Cost Performance Index (CPI) only in week 11, the value of CPI < 1 shows that the actual costs incurred are greater than the completion of the volume of work, resulting in cost overruns). and the amount of money needed to complete the rest of the work is Rp. 1,519,229,597.61 with a total project cost of Rp. 6,779,248,539.11 and the estimated time for completion of this project is 22 weeks.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"73 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.03.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Ministry of Transportation plans to build 16 national strategic airports by 2021. The airports to be built are spread from Sumatra to Papua with a total budget of IDR 1.6 trillion. Projects that are complex and dynamic in their implementation have caused many projects not to go according to plan. Both in terms of time, cost and labor. For this reason, it is necessary to have a consistent and integrated control mechanism for project performance. Earned Value Management (EVM) is one of the appropriate project management techniques used to compare actual work performance against project plans. Outline of project control can identify such as: Time and Schedule ; Is the time used to be longer or faster than the original plan? then, Budget and Costs; Does the budget used exceed the initial budget that has been determined or not, and Performance; Does performance lead to real productivity at the time of reporting? The results of the study explain that in weeks 9 to 12 the SPI value < 1 which indicates that the project is experiencing delays, and starts on schedule in week 13 and accelerates in week 14 while in weeks 15 and 16 it experiences delays again because the value SPI < 1 and back on schedule in week 17. Meanwhile, based on the value of the Cost Performance Index (CPI) only in week 11, the value of CPI < 1 shows that the actual costs incurred are greater than the completion of the volume of work, resulting in cost overruns). and the amount of money needed to complete the rest of the work is Rp. 1,519,229,597.61 with a total project cost of Rp. 6,779,248,539.11 and the estimated time for completion of this project is 22 weeks.
通过在机场运输项目中获得价值的方法分析成本和时间性能
交通运输部计划到2021年为止建设16个国家战略机场。这些机场将从苏门答腊岛延伸到巴布亚岛,总预算为1.6万亿印尼盾。项目在实施过程中是复杂和动态的,这导致许多项目没有按计划进行。无论是在时间、成本还是劳动力方面。因此,有必要建立一个一致的、综合的项目绩效控制机制。挣值管理(EVM)是一种适当的项目管理技术,用于将实际工作绩效与项目计划进行比较。项目控制大纲可以识别如:时间和进度;使用的时间是否比原计划更长或更快?然后是预算和成本;所使用的预算是否超出已确定的初始预算,以及绩效;在报告时,绩效是否带来了真正的生产力?研究结果解释说,在第9至12周,SPI值< 1,这表明该项目正在经历延迟,并在第13周按计划开始,并在第14周加速,而在第15和16周,它再次经历延迟,因为SPI值< 1,并在第17周恢复进度。同时,仅从第11周的成本绩效指数(CPI)来看,如果CPI < 1,说明实际发生的成本大于完成的工作量,导致成本超支)。完成剩余工作所需资金为Rp. 1,519,229,597.61,项目总成本为Rp. 6,779,248,539.11,项目预计完成时间为22周。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书