{"title":"Condition-based maintenance optimization for deteriorating systems considering performance-based contracting and destructive inspections","authors":"Yu-Jun Zhang, Yukun Wang, Xiaopeng Li, Yiliu Liu, Weizheng Gao","doi":"10.1177/1748006x221148239","DOIUrl":null,"url":null,"abstract":"As a novel contracting approach, the performance-based contracting (PBC) utilizes defined performance goals and structured incentives to improve the system availability and reduce the cost by tying the compensation to the service supplier to the system performance outcome. In this paper, two new CBM optimization models within the PBC framework are proposed considering the impacts of destructive inspections on the system degradation behavior. The average maintenance cost rate and the system availability within the contract horizon are estimated. Under the inspection-based replacement scheme, the objectives are to maximize the expected profit rate to the supplier and/or the resulting system average availability. A solution procedure based on the non-dominated sorting genetic algorithm (NSGA-II) combining with the weighted sum method (WSM) is introduced to derive the optimal CBM policies. Numerical examples and sensitivity analysis are conducted to examine the applicability of the proposed models.","PeriodicalId":51266,"journal":{"name":"Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability","volume":"9 1","pages":""},"PeriodicalIF":1.7000,"publicationDate":"2023-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1177/1748006x221148239","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0
Abstract
As a novel contracting approach, the performance-based contracting (PBC) utilizes defined performance goals and structured incentives to improve the system availability and reduce the cost by tying the compensation to the service supplier to the system performance outcome. In this paper, two new CBM optimization models within the PBC framework are proposed considering the impacts of destructive inspections on the system degradation behavior. The average maintenance cost rate and the system availability within the contract horizon are estimated. Under the inspection-based replacement scheme, the objectives are to maximize the expected profit rate to the supplier and/or the resulting system average availability. A solution procedure based on the non-dominated sorting genetic algorithm (NSGA-II) combining with the weighted sum method (WSM) is introduced to derive the optimal CBM policies. Numerical examples and sensitivity analysis are conducted to examine the applicability of the proposed models.
期刊介绍:
The Journal of Risk and Reliability is for researchers and practitioners who are involved in the field of risk analysis and reliability engineering. The remit of the Journal covers concepts, theories, principles, approaches, methods and models for the proper understanding, assessment, characterisation and management of the risk and reliability of engineering systems. The journal welcomes papers which are based on mathematical and probabilistic analysis, simulation and/or optimisation, as well as works highlighting conceptual and managerial issues. Papers that provide perspectives on current practices and methods, and how to improve these, are also welcome