{"title":"Muna-Buton System Generation Expansion Planning by Considering the Interconnection System","authors":"Ahmad Fatana, Sarjiya, Lesnanto Multa Putranto","doi":"10.22146/jnteti.v11i3.3508","DOIUrl":null,"url":null,"abstract":"Electrical energy consumption has increased annually. It is in line with the fulfillment of electricity sales for the last five years (2013-2017) with a 5.1% growth per year. Muna and Buton are large islands in Southeast Sulawesi with a population of 360,682 and an area of 7,712.18 km2. Muna and Buton are two main cities in Southeast Sulawesi that are developing rapidly. Those two regions are relatively rich in natural potential, promoting local economic growth. The primary source of electricity for both regions is Buton. Current electricity consumption in Muna and Buton is relatively high, with a peak load of 37 MW primarily fulfilled by diesel power plants (pembangkit listrik tenaga diesel, PLTD) of 30.15 MW. The government's target to achieve a new renewable energy mix (NRE) of 23% in 2025 and 31% in 2050 is contrary to the situation of generations in Muna and Buton, which is currently still dominated by PLTD. The planning was conducted by looking at its effect on the cost of generation construction, reserve margin, energy mix, and total cost. The desired optimization value was achieved through several performed scenarios, i.e., an isolated or pre-interconnection scenario, assuming each system was separated, and an interconnection system, assuming that interconnection was performed in Muna and Buton system. The optimization method was carried out using mixed-integer linear programming (MILP) by employing the OSeMOSYS software platform. The optimization results show that the Muna-Buton generation expansion planning has been successfully carried out. Of the several performed scenarios, the scenario with the interconnection system can be selected as the best option. It is based on the total cost value and reduced generation costs of 1,073 IDR per kWh in 2022 and 1,362 IDR per kWh in 2047, with an average of 1,202 IDR per kWh.","PeriodicalId":31477,"journal":{"name":"Jurnal Nasional Teknik Elektro dan Teknologi Informasi","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Nasional Teknik Elektro dan Teknologi Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/jnteti.v11i3.3508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electrical energy consumption has increased annually. It is in line with the fulfillment of electricity sales for the last five years (2013-2017) with a 5.1% growth per year. Muna and Buton are large islands in Southeast Sulawesi with a population of 360,682 and an area of 7,712.18 km2. Muna and Buton are two main cities in Southeast Sulawesi that are developing rapidly. Those two regions are relatively rich in natural potential, promoting local economic growth. The primary source of electricity for both regions is Buton. Current electricity consumption in Muna and Buton is relatively high, with a peak load of 37 MW primarily fulfilled by diesel power plants (pembangkit listrik tenaga diesel, PLTD) of 30.15 MW. The government's target to achieve a new renewable energy mix (NRE) of 23% in 2025 and 31% in 2050 is contrary to the situation of generations in Muna and Buton, which is currently still dominated by PLTD. The planning was conducted by looking at its effect on the cost of generation construction, reserve margin, energy mix, and total cost. The desired optimization value was achieved through several performed scenarios, i.e., an isolated or pre-interconnection scenario, assuming each system was separated, and an interconnection system, assuming that interconnection was performed in Muna and Buton system. The optimization method was carried out using mixed-integer linear programming (MILP) by employing the OSeMOSYS software platform. The optimization results show that the Muna-Buton generation expansion planning has been successfully carried out. Of the several performed scenarios, the scenario with the interconnection system can be selected as the best option. It is based on the total cost value and reduced generation costs of 1,073 IDR per kWh in 2022 and 1,362 IDR per kWh in 2047, with an average of 1,202 IDR per kWh.
考虑互联系统的muna - button系统发电扩展规划
电能消耗逐年增加。这与过去五年(2013-2017年)的电力销售情况相符,每年增长5.1%。穆纳岛和布顿岛是苏拉威西岛东南部的两个大岛,人口为360682人,面积为7712.18平方公里。穆纳和布顿是苏拉威西岛东南部发展迅速的两个主要城市。这两个地区的自然潜力相对丰富,促进了当地的经济增长。这两个地区的主要电力来源都是巴顿。穆纳和巴顿目前的用电量相对较高,37兆瓦的峰值负荷主要由30.15兆瓦的柴油发电厂(pembangkit listrik tenaga diesel, PLTD)完成。政府的目标是在2025年实现23%的新可再生能源结构(NRE),到2050年实现31%,这与Muna和Buton的几代人的情况相反,目前仍然由PLTD主导。规划是通过观察其对发电建设成本、储备边际、能源结构和总成本的影响来进行的。通过多个执行场景,即假设各系统分离的隔离或预互联场景,以及假设在Muna和button系统中进行互联的互联系统,实现了期望的优化值。利用OSeMOSYS软件平台,采用混合整数线性规划(MILP)方法进行优化。优化结果表明,muna - button发电扩展规划已成功实施。在执行的几个场景中,可以选择具有互联系统的场景作为最佳选项。这是基于总成本价值和降低的发电成本,2022年为每千瓦时1,073印尼盾,2047年为每千瓦时1,362印尼盾,平均为每千瓦时1,202印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信