{"title":"开都河调蓄性水利工程对下游洪水的影响分析","authors":"节卫 龚","doi":"10.32629/hwr.v4i8.3249","DOIUrl":null,"url":null,"abstract":"对开都河洪水、水利工程进行阐述,并以开都河两河入河口处(乌拉斯台河和黄水沟汇入口)为节点,分别对有、无调蓄性水利工程影响下的设计洪峰流量计算。通过对设计成果的对比分析,中游蓄滞性水利工程对开都河下游洪水影响较大,下游水利工程设计洪水时应考虑中游蓄滞性工程的影响。","PeriodicalId":69978,"journal":{"name":"广西水利水电","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"广西水利水电","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.32629/hwr.v4i8.3249","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
开都河调蓄性水利工程对下游洪水的影响分析
对开都河洪水、水利工程进行阐述,并以开都河两河入河口处(乌拉斯台河和黄水沟汇入口)为节点,分别对有、无调蓄性水利工程影响下的设计洪峰流量计算。通过对设计成果的对比分析,中游蓄滞性水利工程对开都河下游洪水影响较大,下游水利工程设计洪水时应考虑中游蓄滞性工程的影响。