Abandonment of Wells Under the New Norm – Sacrificial Tubing Approach

M. A. Abitalhah, Nurul Nadia Ezzatty Abu Bakar, M. Hod, Avinash Kishore Kumar, C. Lau, Mya Thuzar
{"title":"Abandonment of Wells Under the New Norm – Sacrificial Tubing Approach","authors":"M. A. Abitalhah, Nurul Nadia Ezzatty Abu Bakar, M. Hod, Avinash Kishore Kumar, C. Lau, Mya Thuzar","doi":"10.4043/31369-ms","DOIUrl":null,"url":null,"abstract":"\n This paper presents the success story of an exploration well in Malaysia evaluating the conventional approach of stacked cement plugs against the use of sacrificial tubing with a hydraulic disconnect sub system.\n Plug and Abandonment (P&A) is the process where the well is sealed permanently, and permanent well barrier must extend across the full cross section prior rig move. It is vital to ensure that plugged wells do not leak after abandonment, as there could be several potential leak paths or channeling from microannulus. Thus, well integrity shall be the utmost priority in designing the P&A strategy.\n Conventional P&A requires multiple cement plugs of a given length to be set and pressure tested, which could however be quite time-consuming and thus costly. The number of cement plugs will be based on the length of the open hole section, hydrocarbon zones presence or caprock to meet the P&A guidelines. The guidelines require that cement plugs be placed and tested across any open hydrocarbon-bearing formations, across all casing shoes, across freshwater aquifers, and perhaps several other areas near the surface.\n The thought process, design requirement both for the hardware and cement slurry, and execution follow through of a P&A approach with a sacrificial tubing method, driving for cost savings and operational efficiency will be elaborated.\n Some of the key points for replication based on lessons learnt are P&A with sacrificial tubing is economical justified for well scenario. As for the design, tubing centralizers or rotation is required in deviated hole for proper cement placement. Rotation of tubing during cementing is recommended for effective mud removal and cement placement for the case of no centralizer placement.\n This paper provides the novelty of the extensive planning, execution and improvement methods that will aid the project team to save cost and time in plug and abandonment (P&A) the well.","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"125 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31369-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents the success story of an exploration well in Malaysia evaluating the conventional approach of stacked cement plugs against the use of sacrificial tubing with a hydraulic disconnect sub system. Plug and Abandonment (P&A) is the process where the well is sealed permanently, and permanent well barrier must extend across the full cross section prior rig move. It is vital to ensure that plugged wells do not leak after abandonment, as there could be several potential leak paths or channeling from microannulus. Thus, well integrity shall be the utmost priority in designing the P&A strategy. Conventional P&A requires multiple cement plugs of a given length to be set and pressure tested, which could however be quite time-consuming and thus costly. The number of cement plugs will be based on the length of the open hole section, hydrocarbon zones presence or caprock to meet the P&A guidelines. The guidelines require that cement plugs be placed and tested across any open hydrocarbon-bearing formations, across all casing shoes, across freshwater aquifers, and perhaps several other areas near the surface. The thought process, design requirement both for the hardware and cement slurry, and execution follow through of a P&A approach with a sacrificial tubing method, driving for cost savings and operational efficiency will be elaborated. Some of the key points for replication based on lessons learnt are P&A with sacrificial tubing is economical justified for well scenario. As for the design, tubing centralizers or rotation is required in deviated hole for proper cement placement. Rotation of tubing during cementing is recommended for effective mud removal and cement placement for the case of no centralizer placement. This paper provides the novelty of the extensive planning, execution and improvement methods that will aid the project team to save cost and time in plug and abandonment (P&A) the well.
新规范下的弃井——牺牲油管方法
本文介绍了马来西亚的一口探井的成功案例,该探井评估了传统的水泥塞叠加方法与液压分离系统牺牲油管的对比。封井弃井(P&A)是对油井进行永久密封的过程,永久性井眼屏障必须在钻机移动之前延伸到整个横截面。确保封堵井在废弃后不发生泄漏至关重要,因为可能存在几个潜在的泄漏路径或微环空通道。因此,在设计封堵弃井策略时,井的完整性是重中之重。传统的封堵弃井作业需要多个给定长度的水泥塞进行坐封和压力测试,这既耗时又昂贵。水泥塞的数量将根据裸眼段的长度、是否存在油气层或盖层来确定,以满足P&A准则。该指南要求在任何开放的含油气地层、所有套管鞋、淡水含水层以及可能靠近地面的其他区域放置和测试水泥塞。本节将详细阐述思考过程、硬件和水泥浆的设计要求,以及采用牺牲油管的P&A方法的执行过程,以节省成本和提高作业效率。借鉴经验教训的一些关键点是,牺牲油管的弃井作业在井况中是经济合理的。在设计上,在斜井眼需要使用油管扶正器或旋转器,以保证水泥的正确投放。在没有安装扶正器的情况下,建议在固井期间旋转油管,以有效地清除泥浆和固井。本文提供了广泛的规划、执行和改进方法的新颖性,这些方法将帮助项目团队节省封堵和弃井(P&A)的成本和时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信