Plans for upgrading existing conventional 150 kV substations into digital substations in Sulawesi - Indonesia, accompanied by financial studies

Daniel Rio Armanda, Pawenary Pawenary
{"title":"Plans for upgrading existing conventional 150 kV substations into digital substations in Sulawesi - Indonesia, accompanied by financial studies","authors":"Daniel Rio Armanda, Pawenary Pawenary","doi":"10.22441/sinergi.2023.2.013","DOIUrl":null,"url":null,"abstract":"The focus of Indonesia's G20 Presidency lies on three main pillars, one of them is transition to sustainable energy. The development of these conditions forced PLN (State Electricity Company in Indonesia) to innovate by participating in implementing the latest digitalization technology in distribution electrical energy to customers, one way to do this is by implementing the smart grid concept, which is digital substation technology, is considered capable to response the challenges of digitizing the electricity system in the energy distribution sector. Digital substation technology in Indonesia is still in development stage and there are only six pilot projects in scattered locations, hence in-depth research is needed regarding equipment requirements and the amount of investment needed by PLN to build digital substations, especially the plan for implementing digital substations in Sulawesi. One of methods for developing digital substations in Indonesia is upgrading conventional into digital substation. Research is conducted by studying and observing the existing digital substation in Indonesia. Afterwards in this paper will be explained how to upgrade and what materials, or equipment that must be equipped to upgrading conventional substations. Then, what is the actual value of the investment needed by PLN to build or upgrading into a digital substation in Indonesia, especially in Sulawesi. Furthermore, whether the upgrading plans can be declared financially feasible.","PeriodicalId":31051,"journal":{"name":"Jurnal Ilmiah SINERGI","volume":"4599 1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah SINERGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22441/sinergi.2023.2.013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The focus of Indonesia's G20 Presidency lies on three main pillars, one of them is transition to sustainable energy. The development of these conditions forced PLN (State Electricity Company in Indonesia) to innovate by participating in implementing the latest digitalization technology in distribution electrical energy to customers, one way to do this is by implementing the smart grid concept, which is digital substation technology, is considered capable to response the challenges of digitizing the electricity system in the energy distribution sector. Digital substation technology in Indonesia is still in development stage and there are only six pilot projects in scattered locations, hence in-depth research is needed regarding equipment requirements and the amount of investment needed by PLN to build digital substations, especially the plan for implementing digital substations in Sulawesi. One of methods for developing digital substations in Indonesia is upgrading conventional into digital substation. Research is conducted by studying and observing the existing digital substation in Indonesia. Afterwards in this paper will be explained how to upgrade and what materials, or equipment that must be equipped to upgrading conventional substations. Then, what is the actual value of the investment needed by PLN to build or upgrading into a digital substation in Indonesia, especially in Sulawesi. Furthermore, whether the upgrading plans can be declared financially feasible.
在印度尼西亚苏拉威西岛将现有的传统150千伏变电站升级为数字变电站的计划,并附有财务研究
印尼担任二十国集团轮值主席国的工作重点在于三大支柱,其中之一就是向可持续能源转型。这些条件的发展迫使PLN(印度尼西亚国家电力公司)通过参与实施向客户分配电能的最新数字化技术来进行创新,其中一种方法是实施智能电网概念,即数字化变电站技术,被认为能够应对能源分配部门电力系统数字化的挑战。数字化变电站技术在印尼还处于发展阶段,目前只有6个试点项目,分布比较分散,需要对PLN建设数字化变电站的设备要求和投资金额进行深入研究,特别是苏拉威西岛实施数字化变电站的计划。印尼发展数字化变电站的方法之一是将传统变电站升级为数字化变电站。研究是通过研究和观察印度尼西亚现有的数字变电站来进行的。在本文之后将解释如何升级和什么材料,或设备必须配备升级常规变电站。那么,PLN在印度尼西亚,特别是苏拉威西岛建设或升级为数字变电站所需的投资的实际价值是什么?此外,是否可以宣布升级计划在财务上可行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
32
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信