{"title":"Controlled deep perforation by radial drilling of channels with the \"Perfobur\" technical system to intensify the reservoir inflow","authors":"A. Bashirov, I. Galas, I. A. Лягов, M. Nazyrov","doi":"10.54859/kjogi89510","DOIUrl":null,"url":null,"abstract":"The paper presents a technology for controlled deep penetrating perforation using the Perfobur technical system to intensify inflow by drilling radial channels 69 mm in diameter, up to 25 metres in length. This technology was first applied to a carbonate reservoir in the Bashkirian tier, characterised by high heterogeneity and close proximity of bedrock water. \nAn adjacent well, close to the acid fracture well, with identical reservoir properties, was selected. Well \"A\" was acid fractured and well \"B\" was drilled using Perfobur technology with two directional channels, each 14 metres in length. In well \"B\", after drilling the channels, hydrochloric acid solution was injected through a special hydromonitor nozzle at two points. A total of 48 m3 of acid was injected into the \"B\" well. \nComparing the results of well \"B\" with the well where the hydrofracturing was performed allow speaking about high efficiency of the controlled radial drilling technology. The ability to predict the channel trajectory, knowledge of its actual trajectory in combination with acid treatment of the reservoir using hydromonitor nozzle at a considerable distance from the reservoir allows achieving a significant increase in oil flow rate with lower water cut of the produced oil.","PeriodicalId":17771,"journal":{"name":"Kazakhstan journal for oil & gas industry","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Kazakhstan journal for oil & gas industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54859/kjogi89510","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper presents a technology for controlled deep penetrating perforation using the Perfobur technical system to intensify inflow by drilling radial channels 69 mm in diameter, up to 25 metres in length. This technology was first applied to a carbonate reservoir in the Bashkirian tier, characterised by high heterogeneity and close proximity of bedrock water.
An adjacent well, close to the acid fracture well, with identical reservoir properties, was selected. Well "A" was acid fractured and well "B" was drilled using Perfobur technology with two directional channels, each 14 metres in length. In well "B", after drilling the channels, hydrochloric acid solution was injected through a special hydromonitor nozzle at two points. A total of 48 m3 of acid was injected into the "B" well.
Comparing the results of well "B" with the well where the hydrofracturing was performed allow speaking about high efficiency of the controlled radial drilling technology. The ability to predict the channel trajectory, knowledge of its actual trajectory in combination with acid treatment of the reservoir using hydromonitor nozzle at a considerable distance from the reservoir allows achieving a significant increase in oil flow rate with lower water cut of the produced oil.