Managing concurrent execution of multiple activities in product development process

Gyesik Oh, Y. Hong
{"title":"Managing concurrent execution of multiple activities in product development process","authors":"Gyesik Oh, Y. Hong","doi":"10.1177/1063293X20957994","DOIUrl":null,"url":null,"abstract":"Many companies adopt concurrent engineering in their product-development projects in order to reduce time to market. Concurrent engineering requires careful management, since the uncertainty of transferred information leads to rework and renders a development process complex. Most of the existing studies on concurrent engineering have analyzed overlapping between two activities. The present study expanded the research scope by modeling the developmental process of the concurrent execution of multiple activities as the result of management decisions, the overlapping ratio, and the information transfer frequency. When multiple activities are overlapped, it is more difficult to model a development process, since the uncertainty of cascaded information has impacts on many activities. The quantitative model developed in the present study provides insights into the uncertainty of information and the product-development process. Based on the generalized process model for multiple-activity overlapping, the optimal decision to minimize project duration was considered. As a solution to the dilemma of the high computational burden of considering all feasible decision sets, this paper proposes a myopic heuristic. The project management heuristic proposed in this paper is intended to assist managers in the decision-making process, as well as reducing the intermediate deadlines in project main plan.","PeriodicalId":10680,"journal":{"name":"Concurrent Engineering","volume":"34 1","pages":"210 - 221"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Concurrent Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1063293X20957994","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Many companies adopt concurrent engineering in their product-development projects in order to reduce time to market. Concurrent engineering requires careful management, since the uncertainty of transferred information leads to rework and renders a development process complex. Most of the existing studies on concurrent engineering have analyzed overlapping between two activities. The present study expanded the research scope by modeling the developmental process of the concurrent execution of multiple activities as the result of management decisions, the overlapping ratio, and the information transfer frequency. When multiple activities are overlapped, it is more difficult to model a development process, since the uncertainty of cascaded information has impacts on many activities. The quantitative model developed in the present study provides insights into the uncertainty of information and the product-development process. Based on the generalized process model for multiple-activity overlapping, the optimal decision to minimize project duration was considered. As a solution to the dilemma of the high computational burden of considering all feasible decision sets, this paper proposes a myopic heuristic. The project management heuristic proposed in this paper is intended to assist managers in the decision-making process, as well as reducing the intermediate deadlines in project main plan.
管理产品开发过程中多个活动的并发执行
许多公司在其产品开发项目中采用并行工程,以缩短产品上市时间。并行工程需要仔细的管理,因为传递信息的不确定性会导致返工,并使开发过程变得复杂。现有的并行工程研究大多分析了两个活动之间的重叠。本研究通过对管理决策、重叠率、信息传递频率等因素对多活动并发执行的发展过程进行建模,拓展了研究范围。当多个活动重叠时,由于级联信息的不确定性会对许多活动产生影响,因此对开发过程建模更加困难。本研究建立的定量模型提供了对信息不确定性和产品开发过程的见解。基于多活动重叠的广义过程模型,考虑了最小化项目工期的最优决策。为了解决考虑所有可行决策集的计算量大的困境,本文提出了一种近视启发式算法。本文提出的项目管理启发式方法旨在帮助管理者进行决策,并减少项目主计划中的中间期限。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信