Control of Costs and Working Time of Road Improvement Kh. Syafi'i

Q4 Physics and Astronomy
Suci Fitriyani
{"title":"Control of Costs and Working Time of Road Improvement Kh. Syafi'i","authors":"Suci Fitriyani","doi":"10.29138/neutron.v22i01.176","DOIUrl":null,"url":null,"abstract":"This study aims to analyze the optimum time and cost of completing the work after the acceleration of the duration of the KH Road Improvement Project. Syafi'i in Suci Village, Manyar District, Gresik Regency using the Microsfot Project. Acceleration analysis by adding working hours and considering the resulting critical path. This research is also to find out the project performance compared to the initial project plan in terms of cost and time, to find out the estimated final cost of the project needed after the acceleration of implementation.","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/neutron.v22i01.176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to analyze the optimum time and cost of completing the work after the acceleration of the duration of the KH Road Improvement Project. Syafi'i in Suci Village, Manyar District, Gresik Regency using the Microsfot Project. Acceleration analysis by adding working hours and considering the resulting critical path. This research is also to find out the project performance compared to the initial project plan in terms of cost and time, to find out the estimated final cost of the project needed after the acceleration of implementation.
道路改善工程的成本与工期控制。Syafi胡
本研究旨在分析KH道路改善工程工期加快后完成工作的最佳时间和成本。Gresik Regency Manyar区苏奇村的Syafi'i使用微软项目。通过增加工时和考虑产生的关键路径进行加速度分析。本研究也是为了找出项目在成本和时间方面与最初的项目计划相比的绩效,找出项目加速实施后所需的最终成本估计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信