Developing a Five-year Maintenance and Rehabilitation (M&R) Plan for HMA and Concrete Pavement Networks

Hakan Sahin, Paul Narciso, Narain Hariharan
{"title":"Developing a Five-year Maintenance and Rehabilitation (M&R) Plan for HMA and Concrete Pavement Networks","authors":"Hakan Sahin,&nbsp;Paul Narciso,&nbsp;Narain Hariharan","doi":"10.1016/j.apcbee.2014.01.041","DOIUrl":null,"url":null,"abstract":"<div><p>In the face of increased demand and exposure to environmental effects, the condition of road pavements continues to decline while resources for their preservation remain limited. Thus, the task of managing pavements has to be done systematically and objectively. This paper outlines the steps involved in developing a multi-year pavement Maintenance and Rehabilitation (M&amp;R) plan. These include: (1) condition assessment; (2) network inventory and database development; (3) identification of pavement sections requiring M&amp;R; (3) needs analysis; and (4) impact analysis. As a case study, the project was performed on the road network inside the Texas A&amp;M University campus that consists of 13.95 miles of roadway, 80% and 20% of which are concrete and HMA pavements respectively. Condition assessment was done according to ASTM D 6433-07 and using the Pavement Condition Index (PCI) as indicator of pavement performance. Data collected were then entered into a database which also contains information on traffic and roadway characteristics. PCI threshold values were established to identify sections that are in need of M&amp;R and the most cost- effective treatment based on long-term performance benefit and life-cycle cost was proposed for each project. Candidate projects were then prioritized by ranking based on benefit-cost analysis. The needs estimate provides meaningful information on the total amount of budget required to correct all deficiencies in the network. Finally, the impact analysis is used to determine the impact of a reduced budget on network condition as well as the amount of backlog that needs to be addressed.</p></div>","PeriodicalId":8107,"journal":{"name":"APCBEE Procedia","volume":"9 ","pages":"Pages 230-234"},"PeriodicalIF":0.0000,"publicationDate":"2014-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.apcbee.2014.01.041","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"APCBEE Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2212670814000426","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

In the face of increased demand and exposure to environmental effects, the condition of road pavements continues to decline while resources for their preservation remain limited. Thus, the task of managing pavements has to be done systematically and objectively. This paper outlines the steps involved in developing a multi-year pavement Maintenance and Rehabilitation (M&R) plan. These include: (1) condition assessment; (2) network inventory and database development; (3) identification of pavement sections requiring M&R; (3) needs analysis; and (4) impact analysis. As a case study, the project was performed on the road network inside the Texas A&M University campus that consists of 13.95 miles of roadway, 80% and 20% of which are concrete and HMA pavements respectively. Condition assessment was done according to ASTM D 6433-07 and using the Pavement Condition Index (PCI) as indicator of pavement performance. Data collected were then entered into a database which also contains information on traffic and roadway characteristics. PCI threshold values were established to identify sections that are in need of M&R and the most cost- effective treatment based on long-term performance benefit and life-cycle cost was proposed for each project. Candidate projects were then prioritized by ranking based on benefit-cost analysis. The needs estimate provides meaningful information on the total amount of budget required to correct all deficiencies in the network. Finally, the impact analysis is used to determine the impact of a reduced budget on network condition as well as the amount of backlog that needs to be addressed.

制定HMA和混凝土路面网络的五年维护和修复计划
面对日益增长的需求和对环境影响的暴露,道路路面的状况继续下降,而保护它们的资源仍然有限。因此,必须系统、客观地完成路面管理任务。本文概述了制定多年路面维护和修复(M&R)计划的步骤。这包括:(1)状态评估;(2)网络清查和数据库开发;(3)识别需要M&R的路面路段;(3)需求分析;(4)影响分析。作为一个案例研究,该项目是在德克萨斯农工大学校园内的道路网络上进行的,该网络由13.95英里的道路组成,其中80%和20%分别是混凝土和HMA路面。根据ASTM D 6433-07进行条件评估,并使用路面状况指数(PCI)作为路面性能的指标。然后将收集到的数据输入数据库,该数据库还包含交通和道路特征信息。建立PCI阈值以确定需要M&R的区段,并根据每个项目的长期绩效效益和生命周期成本提出最具成本效益的处理方法。然后根据收益-成本分析对候选项目进行排序。需求估计数提供了关于纠正网络中所有缺陷所需预算总额的有意义的资料。最后,影响分析用于确定减少预算对网络状况的影响,以及需要解决的积压数量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信