{"title":"Analytic hierarchy process applications in the construction of the project tender","authors":"Hongliang Cao","doi":"10.1109/MSIE.2011.5707715","DOIUrl":null,"url":null,"abstract":"This paper stated the impact of the application of the analytic hierarchy process (referred to as the AHP) factors on construction project bidding. In order to eliminate subjective factors on the results of the tender, indicators (program) is obtained by pairwise comparing the importance of the weight of each index, and determine the pros and cons of each program sort. Finally the evaluation and determination of the fair and scientific method determine the successful tender.","PeriodicalId":18774,"journal":{"name":"MSIE 2011","volume":"13 1","pages":"274-277"},"PeriodicalIF":0.0000,"publicationDate":"2011-02-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"MSIE 2011","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MSIE.2011.5707715","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper stated the impact of the application of the analytic hierarchy process (referred to as the AHP) factors on construction project bidding. In order to eliminate subjective factors on the results of the tender, indicators (program) is obtained by pairwise comparing the importance of the weight of each index, and determine the pros and cons of each program sort. Finally the evaluation and determination of the fair and scientific method determine the successful tender.