Relative importance of time, cost and performance in the NPD process

A. Gupta, K. Brockoff, U. Weisenfeld
{"title":"Relative importance of time, cost and performance in the NPD process","authors":"A. Gupta, K. Brockoff, U. Weisenfeld","doi":"10.1109/PICMET.1991.183639","DOIUrl":null,"url":null,"abstract":"Summary form only given. Using a conjoint analysis experiment, the authors consider how R&D, marketing, and manufacturing managers in Germany make tradeoffs among the three critical variables during the new product development (NPD) process: development schedule, development cost, and product performance. The findings are compared with a similar study of US firms (Rosenau, 1989). The comparison underscores the basic problem: US managers do not emphasize product development speed to the same extent as German managers.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":"28 1","pages":"294-"},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183639","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary form only given. Using a conjoint analysis experiment, the authors consider how R&D, marketing, and manufacturing managers in Germany make tradeoffs among the three critical variables during the new product development (NPD) process: development schedule, development cost, and product performance. The findings are compared with a similar study of US firms (Rosenau, 1989). The comparison underscores the basic problem: US managers do not emphasize product development speed to the same extent as German managers.<>
在新产品开发过程中,时间、成本和性能的相对重要性
只提供摘要形式。采用联合分析实验,作者考察了德国的研发、营销和制造经理如何在新产品开发(NPD)过程中的三个关键变量:开发进度、开发成本和产品性能之间进行权衡。研究结果与对美国公司的类似研究进行了比较(Rosenau, 1989)。这种对比凸显了一个基本问题:美国经理人不像德国经理人那样重视产品开发速度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信