Evaluating different operation modes of a hybrid CSP+PV+TES+BESS plant varying the dispatch priority

Adriana Zurita, Carlos Mata‐Torres, J. Cardemil, R. Escobar
{"title":"Evaluating different operation modes of a hybrid CSP+PV+TES+BESS plant varying the dispatch priority","authors":"Adriana Zurita, Carlos Mata‐Torres, J. Cardemil, R. Escobar","doi":"10.1063/1.5117609","DOIUrl":null,"url":null,"abstract":"This study presents a comparative analysis between two different operation modes of a hybrid CSP+PV plant with TES and a Battery Energy Storage System (BESS) to provide 100 MW of base generation. The first operation mode operates the CSP plant as a back-up of the PV plant and activates the BESS only when the TES needs to be supplemented. The second operation mode operates the BESS as the first back-up of the PV plant, activating the CSP plant only when the BESS reaches its minimum operational capacity. The study evaluates the impact of the operation modes on the hybrid plant performance in three locations of Chile (Crucero, Carrera Pinto, and Santiago). Results of the analysis allow determining which operation mode may provide a better techno-economic annual performance of the hybrid plant when the dispatch priority of the storage sections are varied, considering that the production profile is different between seasons and for each location.This study presents a comparative analysis between two different operation modes of a hybrid CSP+PV plant with TES and a Battery Energy Storage System (BESS) to provide 100 MW of base generation. The first operation mode operates the CSP plant as a back-up of the PV plant and activates the BESS only when the TES needs to be supplemented. The second operation mode operates the BESS as the first back-up of the PV plant, activating the CSP plant only when the BESS reaches its minimum operational capacity. The study evaluates the impact of the operation modes on the hybrid plant performance in three locations of Chile (Crucero, Carrera Pinto, and Santiago). Results of the analysis allow determining which operation mode may provide a better techno-economic annual performance of the hybrid plant when the dispatch priority of the storage sections are varied, considering that the production profile is different between seasons and for each location.","PeriodicalId":21790,"journal":{"name":"SOLARPACES 2018: International Conference on Concentrating Solar Power and Chemical Energy Systems","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SOLARPACES 2018: International Conference on Concentrating Solar Power and Chemical Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5117609","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This study presents a comparative analysis between two different operation modes of a hybrid CSP+PV plant with TES and a Battery Energy Storage System (BESS) to provide 100 MW of base generation. The first operation mode operates the CSP plant as a back-up of the PV plant and activates the BESS only when the TES needs to be supplemented. The second operation mode operates the BESS as the first back-up of the PV plant, activating the CSP plant only when the BESS reaches its minimum operational capacity. The study evaluates the impact of the operation modes on the hybrid plant performance in three locations of Chile (Crucero, Carrera Pinto, and Santiago). Results of the analysis allow determining which operation mode may provide a better techno-economic annual performance of the hybrid plant when the dispatch priority of the storage sections are varied, considering that the production profile is different between seasons and for each location.This study presents a comparative analysis between two different operation modes of a hybrid CSP+PV plant with TES and a Battery Energy Storage System (BESS) to provide 100 MW of base generation. The first operation mode operates the CSP plant as a back-up of the PV plant and activates the BESS only when the TES needs to be supplemented. The second operation mode operates the BESS as the first back-up of the PV plant, activating the CSP plant only when the BESS reaches its minimum operational capacity. The study evaluates the impact of the operation modes on the hybrid plant performance in three locations of Chile (Crucero, Carrera Pinto, and Santiago). Results of the analysis allow determining which operation mode may provide a better techno-economic annual performance of the hybrid plant when the dispatch priority of the storage sections are varied, considering that the production profile is different between seasons and for each location.
评估CSP+PV+TES+BESS混合电厂不同调度优先级的运行模式
本研究对具有TES的混合CSP+PV电站和电池储能系统(BESS)提供100兆瓦基础发电的两种不同运行模式进行了比较分析。第一种运行模式将光热电站作为光伏电站的备用电站运行,仅在TES需要补充时才启动BESS。第二种运行模式将BESS作为光伏电站的第一个备份,只有当BESS达到其最小运行容量时才启动CSP电站。该研究在智利的三个地点(克鲁塞罗、卡雷拉平托和圣地亚哥)评估了操作模式对混合电厂性能的影响。考虑到不同季节和不同地点的生产情况不同,分析结果可以确定当不同储存段调度优先级不同时,哪种运行模式可以提供更好的混合电厂年度技术经济绩效。本研究对具有TES的混合CSP+PV电站和电池储能系统(BESS)提供100兆瓦基础发电的两种不同运行模式进行了比较分析。第一种运行模式将光热电站作为光伏电站的备用电站运行,仅在TES需要补充时才启动BESS。第二种运行模式将BESS作为光伏电站的第一个备份,只有当BESS达到其最小运行容量时才启动CSP电站。该研究在智利的三个地点(克鲁塞罗、卡雷拉平托和圣地亚哥)评估了操作模式对混合电厂性能的影响。考虑到不同季节和不同地点的生产情况不同,分析结果可以确定当不同储存段调度优先级不同时,哪种运行模式可以提供更好的混合电厂年度技术经济绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信