Electrical Load Demand of Water Treatment Plant Profiled by Using K-Means Clustering Algorithm with Reliability Consideration

Soraphon Kigsirisin, O. Noohawm
{"title":"Electrical Load Demand of Water Treatment Plant Profiled by Using K-Means Clustering Algorithm with Reliability Consideration","authors":"Soraphon Kigsirisin, O. Noohawm","doi":"10.18178/ijoee.6.1.20-25","DOIUrl":null,"url":null,"abstract":"Monitoring Electrical Load Demand (ELD) is very crucial for plants and manufacturers to observe the electrical consumption and to set the rate of a primary source, the source limit, for supplying electricity to their own electrical system. This study presents CalinskiHarabasz criterion method to find out K value in order to divide ELD of Bangkhen water treatment plant (BKP), the largest water treatment plant in Thailand and South-East Asia, as a case study into K groups. ELD of BKP recorded in twelve months is shown and analyzed by this method. Three seasons are done, too. Then, K-means clustering algorithm is applied to find the centroid value, the cluster center, of K group. The maximum cluster center is used to be the source limit to supply electricity to the plant. Moreover, this study evaluates reliability indices to find out the security of the plant from using the source limit. They are shown and discussed, when the peak load demand occurs. ","PeriodicalId":13951,"journal":{"name":"International Journal of Electrical Energy","volume":"36 1","pages":"20-25"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18178/ijoee.6.1.20-25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Monitoring Electrical Load Demand (ELD) is very crucial for plants and manufacturers to observe the electrical consumption and to set the rate of a primary source, the source limit, for supplying electricity to their own electrical system. This study presents CalinskiHarabasz criterion method to find out K value in order to divide ELD of Bangkhen water treatment plant (BKP), the largest water treatment plant in Thailand and South-East Asia, as a case study into K groups. ELD of BKP recorded in twelve months is shown and analyzed by this method. Three seasons are done, too. Then, K-means clustering algorithm is applied to find the centroid value, the cluster center, of K group. The maximum cluster center is used to be the source limit to supply electricity to the plant. Moreover, this study evaluates reliability indices to find out the security of the plant from using the source limit. They are shown and discussed, when the peak load demand occurs. 
考虑可靠性的k均值聚类算法对水厂电力负荷需求进行了分析
监测电力负荷需求(ELD)对于工厂和制造商观察电力消耗和设定一次电源的速率,即电源限制,为自己的电力系统供电非常重要。本研究以泰国及东南亚最大的水处理厂——曼谷水处理厂(BKP)为例,采用CalinskiHarabasz准则法求K值,将其ELD划分为K组。用这种方法显示和分析了12个月来BKP的ELD。三季也结束了。然后,采用K-means聚类算法求K群的质心值,即聚类中心。最大集群中心用作向工厂供电的源限值。此外,本文还对可靠性指标进行了评估,从源限值出发,确定了电站的安全性。当出现峰值负荷需求时,它们被显示和讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信