A Project Life-Cycle Readiness Approach to Manage Construction Waste in Jordan

IF 1.8 Q3 MANAGEMENT
Saad Zighan, Moheeb Abualqumboz
{"title":"A Project Life-Cycle Readiness Approach to Manage Construction Waste in Jordan","authors":"Saad Zighan, Moheeb Abualqumboz","doi":"10.5130/ajceb.v21i3.7628","DOIUrl":null,"url":null,"abstract":"The construction industry is well-known for generating the largest amount of waste amongst other industries, which significantly pollutes the environment. This study, therefore, examines the causes and sources of waste in construction projects, considering activities, inputs, and outputs of each phase of the construction projects’ lifecycle (i.e., concept, definition, deployment, and transition). Thirty semi-structured interviews were conducted with professionals in construction projects in Jordan, including architects, contractors, and project administrators. The findings reveal that waste resulting from construction projects passes across several organized operations from generation to final disposal. Furthermore, waste is generated in small amounts at the early stages of the project construction but grows as the project progresses towards the end. This paper’s key contribution is to supplement the literature on waste management solutions by providing a holistic approach to tackling waste at its root by including waste management strategies across the project lifecycle phases, not only during the construction phase. This is done with a management readiness view to develop a suitable strategy for construction waste minimization and improve the management of construction projects. This study’s practical implication is providing a holistic waste management framework for practitioners to adopt in the early stages of the project.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2021-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v21i3.7628","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

Abstract

The construction industry is well-known for generating the largest amount of waste amongst other industries, which significantly pollutes the environment. This study, therefore, examines the causes and sources of waste in construction projects, considering activities, inputs, and outputs of each phase of the construction projects’ lifecycle (i.e., concept, definition, deployment, and transition). Thirty semi-structured interviews were conducted with professionals in construction projects in Jordan, including architects, contractors, and project administrators. The findings reveal that waste resulting from construction projects passes across several organized operations from generation to final disposal. Furthermore, waste is generated in small amounts at the early stages of the project construction but grows as the project progresses towards the end. This paper’s key contribution is to supplement the literature on waste management solutions by providing a holistic approach to tackling waste at its root by including waste management strategies across the project lifecycle phases, not only during the construction phase. This is done with a management readiness view to develop a suitable strategy for construction waste minimization and improve the management of construction projects. This study’s practical implication is providing a holistic waste management framework for practitioners to adopt in the early stages of the project.
项目生命周期准备方法在约旦管理建筑废物
众所周知,建筑行业是其他行业中产生废物最多的行业,严重污染了环境。因此,本研究考察了建筑项目中浪费的原因和来源,考虑了建筑项目生命周期的每个阶段的活动、输入和输出(即,概念、定义、部署和转换)。对约旦建筑项目的专业人员进行了30次半结构化访谈,包括建筑师、承包商和项目管理人员。研究结果表明,建筑项目产生的废物从产生到最终处置要经过几个有组织的操作。此外,在项目建设的早期阶段产生的废物很少,但随着项目的进展到最后,废物会增加。本文的主要贡献是补充了关于废物管理解决方案的文献,通过在整个项目生命周期阶段(而不仅仅是在施工阶段)包括废物管理策略,提供了一种从根本上解决废物的整体方法。这样做是基于管理层的准备,以制定适当的策略,尽量减少建筑废物,并改善建筑项目的管理。这项研究的实际意义是提供一个全面的废物管理框架,供从业人员在项目的早期阶段采用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.80
自引率
6.20%
发文量
0
审稿时长
20 weeks
期刊介绍: Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信