Improving the accuracy of project schedules

M. Lorko, Maroš Servátka, Le Zhang
{"title":"Improving the accuracy of project schedules","authors":"M. Lorko, Maroš Servátka, Le Zhang","doi":"10.2139/ssrn.3437760","DOIUrl":null,"url":null,"abstract":"How to avoid project failures driven by overoptimistic schedules? Managers often attempt to mitigate the duration underestimation and improve the accuracy of project schedules by providing their planners with excessively detailed project specifications. While this traditional approach may be intuitive, solely providing more detailed information has proven to have a limited effect on eliminating behavioral biases. We experimentally test the effectiveness of providing detailed specification and compare it to an alternative intervention of providing historical information about the average duration of similar projects in the past. We find that both interventions mitigate the underestimation bias. However, since providing detailed project specification results in high variance of estimation errors due to sizable over- and underestimates, only the provision of historical information leads to more accurate project duration estimates. We also test whether it is more effective to anchor planners by providing historical information simultaneously with the project specification or to provide the historical information only after beliefs regarding the project duration are formed, in which case planners can regress their initial estimates towards the historical average. We find that the timing of disclosing information does not play a role as the estimation bias is mitigated and the accuracy is improved in both conditions. Finally, we observe that the subjective confidence in the accuracy of duration estimates does not vary across the interventions, suggesting that the confidence is neither a function of the amount nor the detail of available information.","PeriodicalId":82888,"journal":{"name":"Technology (Elmsford, N.Y.)","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-10-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology (Elmsford, N.Y.)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3437760","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

How to avoid project failures driven by overoptimistic schedules? Managers often attempt to mitigate the duration underestimation and improve the accuracy of project schedules by providing their planners with excessively detailed project specifications. While this traditional approach may be intuitive, solely providing more detailed information has proven to have a limited effect on eliminating behavioral biases. We experimentally test the effectiveness of providing detailed specification and compare it to an alternative intervention of providing historical information about the average duration of similar projects in the past. We find that both interventions mitigate the underestimation bias. However, since providing detailed project specification results in high variance of estimation errors due to sizable over- and underestimates, only the provision of historical information leads to more accurate project duration estimates. We also test whether it is more effective to anchor planners by providing historical information simultaneously with the project specification or to provide the historical information only after beliefs regarding the project duration are formed, in which case planners can regress their initial estimates towards the historical average. We find that the timing of disclosing information does not play a role as the estimation bias is mitigated and the accuracy is improved in both conditions. Finally, we observe that the subjective confidence in the accuracy of duration estimates does not vary across the interventions, suggesting that the confidence is neither a function of the amount nor the detail of available information.
提高项目进度的准确性
如何避免由于过于乐观的进度而导致的项目失败?管理人员经常试图通过向他们的计划人员提供过于详细的项目规范来减轻持续时间的低估,并提高项目时间表的准确性。虽然这种传统方法可能是直观的,但仅提供更详细的信息已被证明对消除行为偏见的影响有限。我们通过实验测试了提供详细规范的有效性,并将其与提供过去类似项目平均持续时间的历史信息的替代干预进行了比较。我们发现两种干预措施都减轻了低估偏差。然而,由于提供详细的项目规范会导致由于相当大的高估和低估而导致估计误差的高方差,只有提供历史信息才能导致更准确的项目持续时间估计。我们还测试了通过与项目规范同时提供历史信息来锚定规划者是否更有效,或者只有在形成关于项目持续时间的信念之后才提供历史信息,在这种情况下,规划者可以将他们的初始估计回归到历史平均值。我们发现,在两种情况下,信息披露的时间对估计偏差的影响都有所减轻,准确性也有所提高。最后,我们观察到,在不同的干预措施中,对持续时间估计准确性的主观置信度并没有变化,这表明置信度既不是可用信息数量的函数,也不是可用信息细节的函数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信