Preparation for tests of a 110 GHz gyrotron with collector potential depression and status of the ECH system on the DIII-D Tokamak

J. Lohr, R. Callis, J. Doane, Y. Gorelov, H. Grunloh, K. Kajiwara, J. Peavy, D. Ponce, J. Tooker, P. Borchard, S. Chu, S. Cauffman, L. Ives
{"title":"Preparation for tests of a 110 GHz gyrotron with collector potential depression and status of the ECH system on the DIII-D Tokamak","authors":"J. Lohr, R. Callis, J. Doane, Y. Gorelov, H. Grunloh, K. Kajiwara, J. Peavy, D. Ponce, J. Tooker, P. Borchard, S. Chu, S. Cauffman, L. Ives","doi":"10.1109/ICIMW.2004.1421999","DOIUrl":null,"url":null,"abstract":"A 110 GHz gyrotron designed for long pulse operation at P/sub rf/>1.0 MW is tested at the DIII-D facility. The unit is predicted to have efficiency >0.4 with collector potential depression. Some transmission line components require modification for operation at total rf energies >5 MJ per pulse. The ECH system is also being upgraded with the addition of three new gyrotrons.","PeriodicalId":13627,"journal":{"name":"Infrared and Millimeter Waves, Conference Digest of the 2004 Joint 29th International Conference on 2004 and 12th International Conference on Terahertz Electronics, 2004.","volume":"16 1","pages":"153-154"},"PeriodicalIF":0.0000,"publicationDate":"2004-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrared and Millimeter Waves, Conference Digest of the 2004 Joint 29th International Conference on 2004 and 12th International Conference on Terahertz Electronics, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIMW.2004.1421999","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A 110 GHz gyrotron designed for long pulse operation at P/sub rf/>1.0 MW is tested at the DIII-D facility. The unit is predicted to have efficiency >0.4 with collector potential depression. Some transmission line components require modification for operation at total rf energies >5 MJ per pulse. The ECH system is also being upgraded with the addition of three new gyrotrons.
DIII-D托卡马克上集电极电位下降的110 GHz回旋管试验准备及ECH系统状态
在DIII-D设施上对设计用于P/sub rf/>1.0 MW长脉冲工作的110 GHz回旋管进行了测试。预计该装置的效率为>.4,集热器潜力下降。一些传输线组件需要修改以使其在每脉冲总射频能量为5mj的情况下工作。ECH系统也正在升级,增加了三个新的回旋管。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信