{"title":"Challenges of implementing substation hardware upgrades for NERC CIP version 5 compliance to enhance cybersecurity","authors":"J. Cole","doi":"10.1109/TDC.2016.7519964","DOIUrl":null,"url":null,"abstract":"To minimize the vulnerability of the electric power grid to cyberattacks the North American Electric Reliability Corporation (NERC), under the jurisdiction of the Federal Energy Regulatory Commission (FERC), has enacted and enforced cybersecurity standards that continue to evolve as technology and the nature of these threats advance. These Critical Infrastructure Protection (CIP) standards issued by NERC require utilities to meet an aggressive timeline for regulatory compliance. To supplement in-house resources, utilities rely on consultants and suppliers to meet NERC's fast approaching deadlines, such as implementing the latest NERC CIP Version 5 (V5) standards. This paper discusses major design challenges faced when upgrading substation equipment for cybersecurity enhancements and, specifically, the hardware improvements implemented for the NERC CIP V5 conversions.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"20 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519964","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

To minimize the vulnerability of the electric power grid to cyberattacks the North American Electric Reliability Corporation (NERC), under the jurisdiction of the Federal Energy Regulatory Commission (FERC), has enacted and enforced cybersecurity standards that continue to evolve as technology and the nature of these threats advance. These Critical Infrastructure Protection (CIP) standards issued by NERC require utilities to meet an aggressive timeline for regulatory compliance. To supplement in-house resources, utilities rely on consultants and suppliers to meet NERC's fast approaching deadlines, such as implementing the latest NERC CIP Version 5 (V5) standards. This paper discusses major design challenges faced when upgrading substation equipment for cybersecurity enhancements and, specifically, the hardware improvements implemented for the NERC CIP V5 conversions.
实施变电站硬件升级以符合NERC CIP版本5以增强网络安全的挑战
为了最大限度地减少电网对网络攻击的脆弱性,美国联邦能源监管委员会(FERC)管辖下的北美电力可靠性公司(NERC)制定并实施了网络安全标准,该标准随着技术和这些威胁的性质的发展而不断发展。这些由NERC发布的关键基础设施保护(CIP)标准要求公用事业公司满足严格的法规遵从时间表。为了补充内部资源,公用事业公司依靠顾问和供应商来满足NERC快速临近的最后期限,例如实施最新的NERC CIP版本5 (V5)标准。本文讨论了升级变电站设备以增强网络安全时面临的主要设计挑战,特别是为NERC CIP V5转换实施的硬件改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信