Identification of Water Production Mechanism in One of Iran’s Oil Fields and Treat it With Gel Injection

Q4 Chemical Engineering
M. Shabibi, E. Sahraei
{"title":"Identification of Water Production Mechanism in One of Iran’s Oil Fields and Treat it With Gel Injection","authors":"M. Shabibi, E. Sahraei","doi":"10.22059/JCHPE.2021.312133.1334","DOIUrl":null,"url":null,"abstract":"In this study, the problem of water production in one of Iran's oil reservoirs will be examined. First, using the flow rate diagram of oil and water production, the problem of water production will be examined according to time. Then, after confirming the occurrence of water production problem, the mechanism of water production will be investigated using Chan diagnostic diagrams and the created sector model. The results of this study indicate that firstly, the problem of water production in the well under study is observed, and secondly, according to the Decline-curve analysis diagrams, Recovery plot, Chan derivative diagram and schematic shape of the fluid flow movement, it shows the mechanism. Water production is a channel flow process under water injection. A gel treatment at early time with 25% of water cut was studied, for that it was modelled a gel treatment after 500 days of production.The main observation is that by increasing the concentration of injected gel, the rate of oil production increases and the rate of water production decreases. The concentration evaluated concentration was from 0 to 100 (lb/bbl) of solution, a stabilization concentration was not observed. Finally, first by identifying the type of water production mechanism for this reservoir in Iran, it has been determined that it has water production through the canal and then by using a simulation of gel injection, the water production rate has decreased and the oil production rate has increased.","PeriodicalId":15333,"journal":{"name":"Journal of Chemical and Petroleum Engineering","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Chemical and Petroleum Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22059/JCHPE.2021.312133.1334","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Chemical Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

In this study, the problem of water production in one of Iran's oil reservoirs will be examined. First, using the flow rate diagram of oil and water production, the problem of water production will be examined according to time. Then, after confirming the occurrence of water production problem, the mechanism of water production will be investigated using Chan diagnostic diagrams and the created sector model. The results of this study indicate that firstly, the problem of water production in the well under study is observed, and secondly, according to the Decline-curve analysis diagrams, Recovery plot, Chan derivative diagram and schematic shape of the fluid flow movement, it shows the mechanism. Water production is a channel flow process under water injection. A gel treatment at early time with 25% of water cut was studied, for that it was modelled a gel treatment after 500 days of production.The main observation is that by increasing the concentration of injected gel, the rate of oil production increases and the rate of water production decreases. The concentration evaluated concentration was from 0 to 100 (lb/bbl) of solution, a stabilization concentration was not observed. Finally, first by identifying the type of water production mechanism for this reservoir in Iran, it has been determined that it has water production through the canal and then by using a simulation of gel injection, the water production rate has decreased and the oil production rate has increased.
伊朗某油田产水机理识别及注胶治理
在这项研究中,将研究伊朗一个油藏的产水问题。首先,利用油水生产的流量图,根据时间检查出水的问题。然后,在确认出水问题的发生后,利用陈诊断图和所创建的部门模型对出水机理进行研究。研究结果表明:首先观察到研究井的产水问题;其次,根据流体运动的递减曲线分析图、采收率图、陈导数图和示意图形状,揭示了产水问题的机理。注水下的出水是一个通道流动过程。研究了含水25%的早期凝胶处理,并在生产500天后模拟了凝胶处理。主要观察结果是,随着注入凝胶浓度的增加,出油速率增加,出水速率降低。评估浓度为0 ~ 100 (lb/bbl)溶液,未观察到稳定浓度。最后,首先通过识别伊朗该油藏的产水机制类型,确定该油藏通过管道产水,然后通过模拟凝胶注入,产水速率降低,产油量增加。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信