Optimization Location Scenarios of Generation Capacity with ETAP Application

Hestikah Eirene Patoding, Matius Sau, M. Rombe
{"title":"Optimization Location Scenarios of Generation Capacity with ETAP Application","authors":"Hestikah Eirene Patoding, Matius Sau, M. Rombe","doi":"10.34218/ijeet.10.5.2019.001","DOIUrl":null,"url":null,"abstract":"This study aims to determine the distribution of electrical power by considering the addition of generating capacity and the addition of networks using ETAP applications. The simulation results show that for the first scenario the addition of generating capacity is carried out at Barru Bus without the addition of transmission networks, the voltage on bus 36 (Barawaja) stabilizes from 0.92 pu to 1.02 pu, with losses of 17.218 MW and 30.171 MVAR. This shows that power losses have decreased from 18.853 MW and 41.291 MVAR or decreased by 1.635 MW from power losses before the addition of generation in Barru. and the second scenario is the addition of generation at Bontoala and the addition of an express network. the system voltage that previously dropped became stable at the existing tolerance limit. Besides that, there were power losses when adding a generator at the Barru Bus. Thus, the distribution of electricity will be better when there is an additional generation at Bontoala Bus and the addition of an express network in the Sulselbar system.","PeriodicalId":89488,"journal":{"name":"The electronic journal of human sexuality","volume":"165 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The electronic journal of human sexuality","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34218/ijeet.10.5.2019.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to determine the distribution of electrical power by considering the addition of generating capacity and the addition of networks using ETAP applications. The simulation results show that for the first scenario the addition of generating capacity is carried out at Barru Bus without the addition of transmission networks, the voltage on bus 36 (Barawaja) stabilizes from 0.92 pu to 1.02 pu, with losses of 17.218 MW and 30.171 MVAR. This shows that power losses have decreased from 18.853 MW and 41.291 MVAR or decreased by 1.635 MW from power losses before the addition of generation in Barru. and the second scenario is the addition of generation at Bontoala and the addition of an express network. the system voltage that previously dropped became stable at the existing tolerance limit. Besides that, there were power losses when adding a generator at the Barru Bus. Thus, the distribution of electricity will be better when there is an additional generation at Bontoala Bus and the addition of an express network in the Sulselbar system.
基于ETAP的发电容量优化选址方案
本研究旨在通过使用ETAP应用程序考虑发电量的增加和网络的增加来确定电力的分配。仿真结果表明,在不增加输电网的情况下,在Barru母线上增加发电容量,36母线(Barawaja)电压稳定在0.92 ~ 1.02 pu之间,损失为17.218 MW和30.171 MVAR。这表明,与巴鲁新增发电前的功率损失相比,功率损失已从18.853 MW和41.291 MVAR下降或减少了1.635 MW。第二种情况是在Bontoala增加发电和增加一个快速网络。先前下降的系统电压在现有的容差极限下变得稳定。此外,在巴鲁巴士上增加发电机时也出现了电力损失。因此,如果Bontoala公共汽车增加一个发电机组,并在Sulselbar系统中增加一个快速网络,电力分配将会更好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信