Lookback Analysis and Benchmarking to Improve Success Rate of Thru Tubing Perforations for Accessing Behind Casing Opportunities in Brown Fields

Saurabh Anand, M. A. Hamzah, B. Madon, Kok Kin Chun, Anis Izzuddin Othman, M. S. B. M. Ismail, M. Rahim
{"title":"Lookback Analysis and Benchmarking to Improve Success Rate of Thru Tubing Perforations for Accessing Behind Casing Opportunities in Brown Fields","authors":"Saurabh Anand, M. A. Hamzah, B. Madon, Kok Kin Chun, Anis Izzuddin Othman, M. S. B. M. Ismail, M. Rahim","doi":"10.4043/31642-ms","DOIUrl":null,"url":null,"abstract":"\n Accessing behind casing opportunities plays a key role in ensuring that production targets are achieved in the PETRONAS operated fields in Malaysian basin. This is however getting more challenging as these fields comprising mostly of stacked clastic reservoirs get matured. This paper provides a comprehensive review of all thru tubing perforation jobs done over last two years in PETRONAS operated fields in the region with focus on failure reasons and future mitigation measures to ensure higher rate of success.\n As a part of this study, all the historical thru tubing perforation jobs done to access behind casing opportunities over last 2 years across more than 22 producing fields in the region with PETRONAS as the operator were analyzed in detail. These jobs were then studied with respect to the main factors which impacts overall job success or failure. These included but was not limited to fluid contacts, gun, and charge type, nearby well performance, zone saturation data availability, completion type, contractor performance etc. In addition, post job details like sand production, artificial lift performance which contributed to well behavior post perforation were also evaluated. Exhaustive gun perforation and well model simulations were conducted to model post perforation well performance. Actual data with distribution and impact of the above-mentioned parameters will be discussed at length in the paper. Key findings which contribute to the overall successful thru tubing perforation jobs and lessons learnt for future perforation jobs will be presented in the paper.\n Based on the comprehensive review and in-depth analysis, the operator has gained great visibility on key focus areas for thru tubing perforation jobs to increase success rate for completing the behind casing opportunities. Results specially re-iterate the importance of saturation data, gun selection and sand control among other parameters for successful thru tubing perforation jobs in matured stacked reservoirs. The study also indicate why these parameters are even more important for multiple tubular perforations such as cement packers, complex dual string completions, multiple tubular perforation etc. Based on the findings from the study, the paper will recommend key points to consider while completing behind casing opportunities in challenging environment.\n While a lot of literature and study is available on perforations in general, the author could not find any noticeable work which is based on large amount of actual field data on how to improve thru tubing perforation jobs in matured stacked reservoirs in complex completions. This paper aims to help operators improve on the existing practices to ensure better and more successful results while completing behind casing opportunities using thru tubing perforations.","PeriodicalId":11081,"journal":{"name":"Day 2 Wed, March 23, 2022","volume":"81 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, March 23, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31642-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Accessing behind casing opportunities plays a key role in ensuring that production targets are achieved in the PETRONAS operated fields in Malaysian basin. This is however getting more challenging as these fields comprising mostly of stacked clastic reservoirs get matured. This paper provides a comprehensive review of all thru tubing perforation jobs done over last two years in PETRONAS operated fields in the region with focus on failure reasons and future mitigation measures to ensure higher rate of success. As a part of this study, all the historical thru tubing perforation jobs done to access behind casing opportunities over last 2 years across more than 22 producing fields in the region with PETRONAS as the operator were analyzed in detail. These jobs were then studied with respect to the main factors which impacts overall job success or failure. These included but was not limited to fluid contacts, gun, and charge type, nearby well performance, zone saturation data availability, completion type, contractor performance etc. In addition, post job details like sand production, artificial lift performance which contributed to well behavior post perforation were also evaluated. Exhaustive gun perforation and well model simulations were conducted to model post perforation well performance. Actual data with distribution and impact of the above-mentioned parameters will be discussed at length in the paper. Key findings which contribute to the overall successful thru tubing perforation jobs and lessons learnt for future perforation jobs will be presented in the paper. Based on the comprehensive review and in-depth analysis, the operator has gained great visibility on key focus areas for thru tubing perforation jobs to increase success rate for completing the behind casing opportunities. Results specially re-iterate the importance of saturation data, gun selection and sand control among other parameters for successful thru tubing perforation jobs in matured stacked reservoirs. The study also indicate why these parameters are even more important for multiple tubular perforations such as cement packers, complex dual string completions, multiple tubular perforation etc. Based on the findings from the study, the paper will recommend key points to consider while completing behind casing opportunities in challenging environment. While a lot of literature and study is available on perforations in general, the author could not find any noticeable work which is based on large amount of actual field data on how to improve thru tubing perforation jobs in matured stacked reservoirs in complex completions. This paper aims to help operators improve on the existing practices to ensure better and more successful results while completing behind casing opportunities using thru tubing perforations.
提高棕地过油管射孔成功率的回顾分析与基准测试
马来西亚国家石油公司在马来西亚盆地运营的油田,进入套管后的机会对于确保实现生产目标起着关键作用。这是然而变得更具挑战性,因为这些领域主要包括堆碎屑岩储层得到成熟。本文全面回顾了马来西亚国家石油公司在该地区运营的油田在过去两年中完成的所有过油管射孔作业,重点分析了失败原因和未来的缓解措施,以确保更高的成功率。作为研究的一部分,研究人员详细分析了过去两年中该地区超过22个生产油田的所有历史通过油管射孔作业,以进入套管后的机会。然后对这些工作进行研究,研究影响整体工作成功或失败的主要因素。这些因素包括但不限于流体接触、射孔枪和装药类型、附近井动态、层饱和度数据可用性、完井类型、承包商绩效等。此外,还对诸如出砂、人工举升性能等影响射孔后井况的作业细节进行了评估。进行了详尽的射孔枪和井模型模拟,以模拟射孔后的井动态。本文将详细讨论实际数据的分布及其对上述参数的影响。本文将介绍对整个成功的过油管射孔作业做出贡献的关键发现,以及为今后的射孔作业吸取的经验教训。基于全面的评估和深入的分析,作业者对过油管射孔作业的关键重点区域有了更清晰的认识,从而提高了完井后套管的成功率。结果特别重申了饱和度数据、射孔枪选择和防砂等参数对于成功完成成熟叠层储层的过油管射孔作业的重要性。该研究还说明了为什么这些参数对于水泥封隔器、复杂的双管柱完井、多管柱射孔等多管射孔更为重要。根据研究结果,本文将推荐在具有挑战性的环境下完井时需要考虑的关键点。虽然有很多关于射孔的文献和研究,但作者没有发现任何基于大量实际现场数据的关于如何改善复杂完井中成熟堆叠油藏的过油管射孔作业的值得注意的工作。本文旨在帮助作业者改进现有的作业方法,以确保在使用过油管射孔完井时获得更好、更成功的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信