STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO PADA SALURAN IRIGASI DESA ANGANTAKA ABIANSEMAL BADUNG

I. K. Ogik Parmana Putra, I. A. Dwi Giriantari, I. N. Setiawan
{"title":"STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO PADA SALURAN IRIGASI DESA ANGANTAKA ABIANSEMAL BADUNG","authors":"I. K. Ogik Parmana Putra, I. A. Dwi Giriantari, I. N. Setiawan","doi":"10.24843/spektrum.2023.v10.i01.p1","DOIUrl":null,"url":null,"abstract":"The utilization of renewable energy can be a solution to meet the current increasing demand for electrical energy in rural areas, one of which is the use of water energy with the development of PLTMH. In this study, the planning of a microhydro power plant was carried out in the irrigation canal of Angantaka Abiansemal Badung Village as a source of electrical energy to meet the needs of electrical energy. The Angantaka Village irrigation channel has a head 2,1 meters, a width of 1,95 meters, an average depth of 0,88 meters and a water discharge of 0,3045 m3/s. The PLTMH planning system uses a breastshot wheel type water wheel with an efficiency of 75% and TEK STC-5 kW 3 phase AC synchronous generator and a 6 kW ELC control panel. Planning for PLTMH on the irrigation canal of Angantaka Abiansemal Badung Village with a capacity of 3,76 kW / 4,70 kVA. The initial investment cost required is IDR. 72.055.375 with operational and maintenance cost of IDR. 720.553 in one year.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"58 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i01.p1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The utilization of renewable energy can be a solution to meet the current increasing demand for electrical energy in rural areas, one of which is the use of water energy with the development of PLTMH. In this study, the planning of a microhydro power plant was carried out in the irrigation canal of Angantaka Abiansemal Badung Village as a source of electrical energy to meet the needs of electrical energy. The Angantaka Village irrigation channel has a head 2,1 meters, a width of 1,95 meters, an average depth of 0,88 meters and a water discharge of 0,3045 m3/s. The PLTMH planning system uses a breastshot wheel type water wheel with an efficiency of 75% and TEK STC-5 kW 3 phase AC synchronous generator and a 6 kW ELC control panel. Planning for PLTMH on the irrigation canal of Angantaka Abiansemal Badung Village with a capacity of 3,76 kW / 4,70 kVA. The initial investment cost required is IDR. 72.055.375 with operational and maintenance cost of IDR. 720.553 in one year.
策划水力水力发电厂的研究
可再生能源的利用是满足当前农村地区日益增长的电能需求的一种解决方案,随着PLTMH的发展,水能的利用就是其中之一。本研究在Angantaka Abiansemal Badung村的灌溉渠中进行了微型水力发电厂的规划,作为电能的来源,以满足电能的需求。Angantaka村灌溉渠水头2.1米,宽度为1.95米,平均深度为0.88米,排水量为0.3045立方米/秒。PLTMH规划系统使用效率为75%的胸射轮式水轮,TEK stc - 5kw三相交流同步发电机和6kw ELC控制面板。Angantaka Abiansemal Badung村灌溉渠PLTMH规划,容量为3.76千瓦/ 4.70千伏安。所需初始投资成本为印尼盾。72.055.375,运行和维护费用为IDR。一年720.553。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信