{"title":"Using Different Methods to Predict Oil in Place in Mishrif Formation / Amara Oil Field","authors":"M. Najeeb, F. Kadhim, Ghazwan Noori Saed","doi":"10.31699/ijcpe.2020.1.5","DOIUrl":null,"url":null,"abstract":"The reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of reserve estimation used for the Mishrif formation / Amara oil field volumetric approach in mathematic formula (deterministic side) and Monte Carlo Simulation technique (probabilistic side), material balance equation identified by MBAL software and reservoir simulation adopted by  Petrel software geological model.  The results from these three methods were applied by the volumetric method in the deterministic side equal to (2.25 MMMSTB) and probabilistic side equal to (1.24, 2.22, 3.55) MMMSTB P90, P50, P10 respectively. OOIP was determined by MBAL software equal to (2.82 MMMSTB). Finally, the volume calculation of OOIP by using the petrel static model was (1.92 MMMSTB). The percentage error between material balance and the volumetric equation was equal to 20% while the percentage error between the volumetric method and petrel software was 17%.","PeriodicalId":15333,"journal":{"name":"Journal of Chemical and Petroleum Engineering","volume":"21 1","pages":"33-38"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Chemical and Petroleum Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31699/ijcpe.2020.1.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Chemical Engineering","Score":null,"Total":0}
引用次数: 2

Abstract

The reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of reserve estimation used for the Mishrif formation / Amara oil field volumetric approach in mathematic formula (deterministic side) and Monte Carlo Simulation technique (probabilistic side), material balance equation identified by MBAL software and reservoir simulation adopted by  Petrel software geological model.  The results from these three methods were applied by the volumetric method in the deterministic side equal to (2.25 MMMSTB) and probabilistic side equal to (1.24, 2.22, 3.55) MMMSTB P90, P50, P10 respectively. OOIP was determined by MBAL software equal to (2.82 MMMSTB). Finally, the volume calculation of OOIP by using the petrel static model was (1.92 MMMSTB). The percentage error between material balance and the volumetric equation was equal to 20% while the percentage error between the volumetric method and petrel software was 17%.
Mishrif地层/ Amara油田储量预测方法研究
储量估计过程在油田的生命周期内是连续的,由于风险和不准确性被认为是一个地方性问题,因此必须进行研究。此外,只有在油田枯竭时才能确定正确的碳氢化合物含量。因此,储量估计挑战是时间和可用数据的函数。储量估算可分为类比法、体积法、递减曲线分析法、物质平衡法和油藏模拟法五种类型,每一种类型对所需的数据类型都有所不同。选择合适的方法取决于储层成熟度、储层非均质性和所需的数据采集。在本研究中,Mishrif地层/ Amara油田的储量估算采用了三种类型的体积法数学公式(确定性侧)和蒙特卡罗模拟技术(概率侧),MBAL软件识别的物质平衡方程和Petrel软件地质模型采用的油藏模拟。三种方法的结果分别用体积法应用于确定性面(2.25 MMMSTB)和概率面(1.24,2.22,3.55)MMMSTB P90, P50, P10。用MBAL软件测定OOIP = (2.82 MMMSTB)。最后,利用海燕静态模型计算的OOIP体积为(1.92 MMMSTB)。物料衡算与体积方程的误差百分比为20%,体积法与petrel软件的误差百分比为17%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信