The schedulability region of two-level mixed-criticality systems based on EDF-VD

D. Müller, Alejandro Masrur
{"title":"The schedulability region of two-level mixed-criticality systems based on EDF-VD","authors":"D. Müller, Alejandro Masrur","doi":"10.7873/DATE.2014.269","DOIUrl":null,"url":null,"abstract":"The algorithm Earliest Deadline First with Virtual Deadlines (EDF-VD) was recently proposed to schedule mixed-criticality task sets consisting of high-criticality (HI) and low-criticality (LO) tasks. EDF-VD distinguishes between HI and LO mode. In HI mode, the HI tasks may require executing for longer than in LO mode. As a result, in LO mode, EDF-VD assigns virtual deadlines to HI tasks (i.e., it uniformly downscales deadlines of HI tasks) to account for an increase of workload in HI mode. Different schedulability conditions have been proposed in the literature; however, the schedulability region to fully characterize EDF-VD has not been investigated so far. In this paper, we review EDF-VD's schedulability criteria and determine its schedulability region to better understand and design mixed-criticality systems. Based on this result, we show that EDF-VD has a schedulability region being around 85% larger than that of the Worst-Case Reservations (WCR) approach.","PeriodicalId":6550,"journal":{"name":"2014 Design, Automation & Test in Europe Conference & Exhibition (DATE)","volume":"30 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2014-03-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Design, Automation & Test in Europe Conference & Exhibition (DATE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7873/DATE.2014.269","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

The algorithm Earliest Deadline First with Virtual Deadlines (EDF-VD) was recently proposed to schedule mixed-criticality task sets consisting of high-criticality (HI) and low-criticality (LO) tasks. EDF-VD distinguishes between HI and LO mode. In HI mode, the HI tasks may require executing for longer than in LO mode. As a result, in LO mode, EDF-VD assigns virtual deadlines to HI tasks (i.e., it uniformly downscales deadlines of HI tasks) to account for an increase of workload in HI mode. Different schedulability conditions have been proposed in the literature; however, the schedulability region to fully characterize EDF-VD has not been investigated so far. In this paper, we review EDF-VD's schedulability criteria and determine its schedulability region to better understand and design mixed-criticality systems. Based on this result, we show that EDF-VD has a schedulability region being around 85% larger than that of the Worst-Case Reservations (WCR) approach.
基于EDF-VD的两级混合临界系统的可调度区域
针对由高临界任务(HI)和低临界任务(LO)组成的混合临界任务集调度问题,提出了基于虚拟截止日期的最早截止日期优先调度算法(EDF-VD)。EDF-VD区分HI和LO模式。在HI模式下,HI任务需要执行的时间可能比LO模式下长。因此,在LO模式下,EDF-VD为HI任务分配虚拟截止日期(即,它统一降低HI任务的截止日期),以应对HI模式下工作负载的增加。文献中提出了不同的可调度性条件;然而,目前尚未对EDF-VD的可调度区域进行研究。在本文中,我们回顾了EDF-VD的可调度性准则,并确定了其可调度性区域,以便更好地理解和设计混合临界系统。基于这一结果,我们发现EDF-VD方法的可调度区域比最坏情况保留(WCR)方法的可调度区域大85%左右。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信