The Time Validation Facility (TVF): An all-new key element of the Galileo operational phase

R. Piriz, D. Rodríguez, P. Roldan, A. Mudrak, A. Bauch, F. Riedel, E. Staliuniene, J. Galindo, H. Esteban, I. Sesia, G. Cerretto, K. Jaldehag, C. Rieck, P. Uhrich, G. Rovera
{"title":"The Time Validation Facility (TVF): An all-new key element of the Galileo operational phase","authors":"R. Piriz, D. Rodríguez, P. Roldan, A. Mudrak, A. Bauch, F. Riedel, E. Staliuniene, J. Galindo, H. Esteban, I. Sesia, G. Cerretto, K. Jaldehag, C. Rieck, P. Uhrich, G. Rovera","doi":"10.1109/FCS.2015.7138851","DOIUrl":null,"url":null,"abstract":"In the Galileo FOC phase (Full Operational Capability), GMV is the prime contractor for the Time and Geodetic Validation Facility (TGVF), a contract of the European Space Agency (ESA). Within the TGVF, the Time Validation Facility (TVF) is the subsystem in charge of steering Galileo System Time (GST) to UTC, among other duties. The new TVF is operated at GMV headquarters near Madrid, Spain. TVF operations rely on the contribution of five European timing laboratories, located at INRiM, OP, PTB, ROA, and SP. This paper provides a general description of the TVF element and its related activities for the FOC phase, and presents the main results and findings of the TVF operation until now.","PeriodicalId":57667,"journal":{"name":"时间频率公报","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2015-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"时间频率公报","FirstCategoryId":"1089","ListUrlMain":"https://doi.org/10.1109/FCS.2015.7138851","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

In the Galileo FOC phase (Full Operational Capability), GMV is the prime contractor for the Time and Geodetic Validation Facility (TGVF), a contract of the European Space Agency (ESA). Within the TGVF, the Time Validation Facility (TVF) is the subsystem in charge of steering Galileo System Time (GST) to UTC, among other duties. The new TVF is operated at GMV headquarters near Madrid, Spain. TVF operations rely on the contribution of five European timing laboratories, located at INRiM, OP, PTB, ROA, and SP. This paper provides a general description of the TVF element and its related activities for the FOC phase, and presents the main results and findings of the TVF operation until now.
时间验证设施(TVF):伽利略操作阶段的一个全新的关键元素
在伽利略FOC阶段(全面作战能力),GMV是欧洲空间局(ESA)合同的时间和大地测量验证设施(TGVF)的主承包商。在TGVF中,时间验证设施(TVF)是负责将伽利略系统时间(GST)转向UTC的子系统,以及其他职责。新的TVF在西班牙马德里附近的GMV总部运营。TVF操作依赖于位于INRiM、OP、PTB、ROA和SP的五个欧洲授时实验室的贡献。本文概述了TVF元素及其在FOC阶段的相关活动,并介绍了TVF操作到目前为止的主要结果和发现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
1135
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信