{"title":"Meandering Bend Development Process at Mawa Reach of the Padma River","authors":"Muhammad Muzibur Rahman, M. NazrulIslam","doi":"10.4172/2381-8719.1000338","DOIUrl":null,"url":null,"abstract":"The river Padma developed a meandering bend at the right bank of Mawa reach (reach 2) in meandering platform stage. The bend development process started in 1992 and continued in full form up to 2000. Maximum lateral extension occurred 780 m/yr in 1995-96 and average lateral extension was 450 m/yr. During the bend development process the Padma eroded more than 12,500 ha landmass at the bend location. The highly erodible bank materials and river characteristics allowed the bend formation at this location. A good number of samples measurement of different time indicated that the meandering wavelength of the river reach varied from 30 to 40 km. The meandering width of the river reach was about 17 km in 2000. The bend sustained only for 8 years (1992-2000) and was not so concave but the bend has great significance upon the river training work like the constricting Padma River Bridge. Satellite images of CEGIS and several definition diagram models of meandering bend have been developed to explain the bend formation process and bend characteristics.","PeriodicalId":80381,"journal":{"name":"AGSO journal of Australian geology & geophysics","volume":"29 1","pages":"1-7"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AGSO journal of Australian geology & geophysics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4172/2381-8719.1000338","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The river Padma developed a meandering bend at the right bank of Mawa reach (reach 2) in meandering platform stage. The bend development process started in 1992 and continued in full form up to 2000. Maximum lateral extension occurred 780 m/yr in 1995-96 and average lateral extension was 450 m/yr. During the bend development process the Padma eroded more than 12,500 ha landmass at the bend location. The highly erodible bank materials and river characteristics allowed the bend formation at this location. A good number of samples measurement of different time indicated that the meandering wavelength of the river reach varied from 30 to 40 km. The meandering width of the river reach was about 17 km in 2000. The bend sustained only for 8 years (1992-2000) and was not so concave but the bend has great significance upon the river training work like the constricting Padma River Bridge. Satellite images of CEGIS and several definition diagram models of meandering bend have been developed to explain the bend formation process and bend characteristics.
帕德玛河玛瓦河段蜿蜒弯道的开发过程
帕德玛河在曲流台地阶段在玛瓦河段(河段2)右岸形成曲流弯道。弯管的开发过程始于1992年,一直持续到2000年。1995-96年最大侧向扩展量为780 m/yr,平均侧向扩展量为450 m/yr。在弯曲的发展过程中,帕德玛河在弯曲的位置侵蚀了超过12500公顷的陆地。河岸物质的高度可蚀性和河流的特征使得这里形成了弯曲。大量不同时间的样品测量表明,河段的蜿蜒波长在30 ~ 40 km之间。2000年,这条河流蜿蜒的宽度约为17公里。这个弯道只持续了8年(1992-2000),并没有那么凹,但它对河流治理工作有重要意义,比如收缩的帕德玛河大桥。为了解释弯曲的形成过程和弯曲的特征,建立了CEGIS卫星图像和几种曲流弯曲的定义图模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信