An evaluation of the current status of EIA system in Pakistan focusing Khyber Pakhtunkhwa

D. Ahmed, A. Khan, Z. Ali, Daulat Khan, I. Afridi
{"title":"An evaluation of the current status of EIA system in Pakistan focusing Khyber Pakhtunkhwa","authors":"D. Ahmed, A. Khan, Z. Ali, Daulat Khan, I. Afridi","doi":"10.14419/IJBAS.V7I2.7536","DOIUrl":null,"url":null,"abstract":"Pakistan, like many other developing countries has adopted the integration of environmental concerns in its social and economic planning. Pakistan has developed some environmental legislation and policies at the national level for the protection and conservation of environment. This paper evaluates the current status of the environmental assessment system in Pakistan and especially in the Khyber Pakhtunkhwa (KP) province by using the Christopher Wood Evaluation Model. The EIA system in Pakistan has many strong features like the legal basis for assessment process, strong apprehension and willingness for screening and scoping, stakeholder’s involvement and participation, mitigation of impacts, and cost & benefits of EIA system. The limitations found in the assessment process of Pakistan includes Preparation of EIA report and its review, monitoring and auditing, strategic environmental assessment, while consideration of alternatives and decision making mechanisms are completely ignored. Besides these, the study revealed the practice of ineffective remedial measures, non-professional, inexperience and unregistered consultants involved in the environmental assessment and sporadically the politically oriented decision making process. This evaluation led to a series of suggestions regarding the improvement of EIA system in Pakistan and especially KP Province with a view to develop its quality and effectiveness.","PeriodicalId":14296,"journal":{"name":"International Journal of Sciences: Basic and Applied Research","volume":"11 1","pages":"20"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sciences: Basic and Applied Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14419/IJBAS.V7I2.7536","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Pakistan, like many other developing countries has adopted the integration of environmental concerns in its social and economic planning. Pakistan has developed some environmental legislation and policies at the national level for the protection and conservation of environment. This paper evaluates the current status of the environmental assessment system in Pakistan and especially in the Khyber Pakhtunkhwa (KP) province by using the Christopher Wood Evaluation Model. The EIA system in Pakistan has many strong features like the legal basis for assessment process, strong apprehension and willingness for screening and scoping, stakeholder’s involvement and participation, mitigation of impacts, and cost & benefits of EIA system. The limitations found in the assessment process of Pakistan includes Preparation of EIA report and its review, monitoring and auditing, strategic environmental assessment, while consideration of alternatives and decision making mechanisms are completely ignored. Besides these, the study revealed the practice of ineffective remedial measures, non-professional, inexperience and unregistered consultants involved in the environmental assessment and sporadically the politically oriented decision making process. This evaluation led to a series of suggestions regarding the improvement of EIA system in Pakistan and especially KP Province with a view to develop its quality and effectiveness.
以开伯尔-普赫图赫瓦为重点的巴基斯坦环境影响评估系统现状评价
巴基斯坦同许多其他发展中国家一样,已将环境问题纳入其社会和经济规划。巴基斯坦在国家一级为保护和养护环境制定了一些环境立法和政策。本文采用Christopher Wood评价模型对巴基斯坦特别是开伯尔-普赫图赫瓦省的环境评价体系现状进行了评价。巴基斯坦的环评制度具有评估过程的法律依据、对筛选和范围界定的强烈理解和意愿、利益相关者的参与和参与、影响的减轻、环评制度的成本效益等诸多特点。巴基斯坦在评估过程中存在的局限包括环境影响评估报告的编制和审查、监测和审计、战略环境评估,而对替代方案和决策机制的考虑完全被忽视。除此之外,这项研究还揭示了无效补救措施的做法、参与环境评价的非专业、缺乏经验和未注册的顾问以及偶尔有政治导向的决策过程。这一评价为巴基斯坦特别是KP省环境影响评估系统的改进提出了一系列建议,以期提高其质量和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信