{"title":"Improving preliminary cost estimation in Indonesia using support vector regression","authors":"Jieh-Haur Chen, Yu-Min Su, Diana Wahyu Hayati, Indradi Wijatmiko, Ragil Purnamasari","doi":"10.1680/JMAPL.18.00040","DOIUrl":null,"url":null,"abstract":"A typical preliminary cost estimation for a building construction project in Indonesia may take weeks and have an error rate varying from around −13 to +27%. The research objectives of this study w...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JMAPL.18.00040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 2
Abstract
A typical preliminary cost estimation for a building construction project in Indonesia may take weeks and have an error rate varying from around −13 to +27%. The research objectives of this study w...