{"title":"Cost Optimization in Building Construction Projects with Special Reference to Kathmandu Valley of Nepal","authors":"Surendra Kumar Karn, K. Dahal","doi":"10.11648/J.AJSET.20210601.12","DOIUrl":null,"url":null,"abstract":": Cost optimization is a process that should be carried out throughout the construction period to ensure that the cost of the project is within an allotted budget. Time and cost are the two most significant factors in any construction project. Cost increases with the time of construction. The objective of this study was to find out the factors that contribute to the optimization of construction costs in building construction projects in Nepal. The study was conducted during the period from April 2019 to September 2020. Field observation, in-depth interviews, focus group discussions and questionnaire surveys were the major tools for the investigation of this study. The findings were analyzed in nine categories: project related factors, design related factors, owner related factors, consultant related factors, contractor related factors, material related factors, labor related factors, equipment related factors, and external factors. The study found some key factors related to time and cost overrun, optimizing cost of construction and the strategies to optimize project costs. The most important strategy to optimize the construction cost are effective cost planning and control, development of proper monitoring and tracking system, sound working environment, recording daily work progress, using time cost trade off, follow plan-do-check-act quality policy, hire skilled labor and effective supervision. The study suggests that constructability and value engineering principles should be adopted in construction projects.","PeriodicalId":93409,"journal":{"name":"American journal of engineering, science and technology","volume":"75 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"American journal of engineering, science and technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.AJSET.20210601.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

: Cost optimization is a process that should be carried out throughout the construction period to ensure that the cost of the project is within an allotted budget. Time and cost are the two most significant factors in any construction project. Cost increases with the time of construction. The objective of this study was to find out the factors that contribute to the optimization of construction costs in building construction projects in Nepal. The study was conducted during the period from April 2019 to September 2020. Field observation, in-depth interviews, focus group discussions and questionnaire surveys were the major tools for the investigation of this study. The findings were analyzed in nine categories: project related factors, design related factors, owner related factors, consultant related factors, contractor related factors, material related factors, labor related factors, equipment related factors, and external factors. The study found some key factors related to time and cost overrun, optimizing cost of construction and the strategies to optimize project costs. The most important strategy to optimize the construction cost are effective cost planning and control, development of proper monitoring and tracking system, sound working environment, recording daily work progress, using time cost trade off, follow plan-do-check-act quality policy, hire skilled labor and effective supervision. The study suggests that constructability and value engineering principles should be adopted in construction projects.
建筑工程造价优化——以尼泊尔加德满都谷地为例
成本优化是一个过程,应在整个建设期间进行,以确保项目的成本在预算范围内。时间和成本是任何建设项目中最重要的两个因素。成本随着施工时间的增加而增加。本研究的目的是找出有助于在尼泊尔建设项目的建设成本优化的因素。该研究于2019年4月至2020年9月期间进行。实地观察、深度访谈、焦点小组讨论和问卷调查是本研究的主要调查工具。调查结果分为9类:项目相关因素、设计相关因素、业主相关因素、顾问相关因素、承包商相关因素、材料相关因素、劳动力相关因素、设备相关因素和外部因素。研究发现了与时间和成本超支、施工成本优化以及项目成本优化策略相关的关键因素。有效的成本计划和控制、建立适当的监测和跟踪系统、良好的工作环境、记录日常工作进度、利用时间成本权衡、遵循计划-执行-检查-执行的质量方针、雇用熟练的工人和有效的监督是优化工程成本的最重要的策略。研究表明,建设项目应遵循可施工性原则和价值工程原则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信