ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP ON-GRID 463,25 kWp DI PERUSAHAAN FARMASI PADA KAWASAN PT JAKARTA INDUSTRIAL ESTATE PULOGADUNG, JAKARTA TIMUR

Neysa Amelia Hutagalung, Nyoman Setiawan, Wayan Sukerayasa, I. N. Setiawan
{"title":"ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP ON-GRID 463,25 kWp DI PERUSAHAAN FARMASI PADA KAWASAN PT JAKARTA INDUSTRIAL ESTATE PULOGADUNG, JAKARTA TIMUR","authors":"Neysa Amelia Hutagalung, Nyoman Setiawan, Wayan Sukerayasa, I. N. Setiawan","doi":"10.24843/spektrum.2023.v10.i02.p9","DOIUrl":null,"url":null,"abstract":"The number of PLTS installed on factory rooftops is growing. In Indonesia, the Directorate General of New, Renewable Energy estimates a total renewable energy potential of 442 GW, with solar energy holding the greatest potential. The performance of the PLTS system needs to be considered to ensure good performance in generating electricity. This research focuses on the rooftop on-grid PLTS system in a Pharmaceutical Company located in the PT Jakarta Industrial Estate Pulo Gadung area, with a capacity of 463.25 kWp. Electricity generation potential is modeled using PVSyst software for examination of the PLTS system's performance. For the period of one year, from November 2021 through October 2022, the PLTS system's performance characteristics are determined. These include the Yield Factor (Yf), Reference Yield (Yr), Performance Ratio (PR), and Capacity Utilization Factor (CUF). According to the model, the 463.25 kWp on-grid rooftop PLTS system may generate up to 629,550 kWh of power each year. The values of the PLTS system performance parameters are as follows: Yield Factor (Yf) is 1,358.99 kWh/kWp, Reference Yield (Yr) is 1,730.6 kWh/kW, Performance Ratio (PR) is 78.56%, and Capacity Utilization Factor (CUF) is 15.73%. Meanwhile, the actual electricity production for one year is 570,724.82 kWh, with the following performance parameters for the PLTS system: Yield Factor (Yf) is 1,232 kWh/kWp, Reference Yield (Yr) is 1,642.85 kWh/kW, Performance Ratio (PR) is 76.12%, and Capacity Utilization Factor (CUF) is 14.26%. There is a difference between the PVSyst software simulation and the actual results, which are 58,825.18 kWh, 126.98 kWh/kWp, 87.75 kWh/kW, 2.44%, and 1.47% respectively.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"38 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i02.p9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The number of PLTS installed on factory rooftops is growing. In Indonesia, the Directorate General of New, Renewable Energy estimates a total renewable energy potential of 442 GW, with solar energy holding the greatest potential. The performance of the PLTS system needs to be considered to ensure good performance in generating electricity. This research focuses on the rooftop on-grid PLTS system in a Pharmaceutical Company located in the PT Jakarta Industrial Estate Pulo Gadung area, with a capacity of 463.25 kWp. Electricity generation potential is modeled using PVSyst software for examination of the PLTS system's performance. For the period of one year, from November 2021 through October 2022, the PLTS system's performance characteristics are determined. These include the Yield Factor (Yf), Reference Yield (Yr), Performance Ratio (PR), and Capacity Utilization Factor (CUF). According to the model, the 463.25 kWp on-grid rooftop PLTS system may generate up to 629,550 kWh of power each year. The values of the PLTS system performance parameters are as follows: Yield Factor (Yf) is 1,358.99 kWh/kWp, Reference Yield (Yr) is 1,730.6 kWh/kW, Performance Ratio (PR) is 78.56%, and Capacity Utilization Factor (CUF) is 15.73%. Meanwhile, the actual electricity production for one year is 570,724.82 kWh, with the following performance parameters for the PLTS system: Yield Factor (Yf) is 1,232 kWh/kWp, Reference Yield (Yr) is 1,642.85 kWh/kW, Performance Ratio (PR) is 76.12%, and Capacity Utilization Factor (CUF) is 14.26%. There is a difference between the PVSyst software simulation and the actual results, which are 58,825.18 kWh, 126.98 kWh/kWp, 87.75 kWh/kW, 2.44%, and 1.47% respectively.
安装在工厂屋顶上的PLTS数量正在增长。在印度尼西亚,新可再生能源总局估计可再生能源的总潜力为442吉瓦,其中太阳能的潜力最大。为了保证PLTS系统的良好发电性能,需要考虑PLTS系统的性能。本研究以位于PT Jakarta Industrial Estate Pulo Gadung区的某制药公司的屋顶并网PLTS系统为研究对象,该系统容量为463.25 kWp。利用PVSyst软件对发电潜力进行建模,以检查PLTS系统的性能。从2021年11月到2022年10月,在一年的时间里,确定了PLTS系统的性能特征。这些指标包括产量系数(Yf)、参考产量(Yr)、性能比(PR)和产能利用率(CUF)。根据该模型,463.25 kWp的并网屋顶PLTS系统每年可产生高达629550 kWh的电力。PLTS系统性能参数取值为:Yield Factor (Yf)为1358.99 kWh/kWp,参考Yield (Yr)为1730.6 kWh/kW, performance Ratio (PR)为78.56%,Capacity Utilization Factor (CUF)为15.73%。同时,实际1年发电量为570,724.82 kWh, PLTS系统的性能参数为:产率Yf为1,232 kWh/kWp,参考产率Yr为1,642.85 kWh/kW,性能比PR为76.12%,容量利用率CUF为14.26%。PVSyst软件仿真结果与实际相差较大,分别为58,825.18 kWh、126.98 kWh/kWp、87.75 kWh/kW、2.44%和1.47%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信