Managing portfolio’s risk for improving quality in a project oriented manufacture

Farshad Shirazi
{"title":"Managing portfolio’s risk for improving quality in a project oriented manufacture","authors":"Farshad Shirazi","doi":"10.52547/ijie.1.1.48","DOIUrl":null,"url":null,"abstract":"Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage their efforts based on production management and project management practices; these kind of manufactures are known as project oriented manufacture. It is very important to manage and control manufacturing equipment project with the consideration of the constraints (time, cost, scope and quality). During the project’s lifecycle many risks take place, either positive or negative that should be controlled not to have a negative effect on quality of the project. With considering this concept, in this paper we will discuss a framework how to manage risks to eliminate negative effects on the quality of the project.","PeriodicalId":31435,"journal":{"name":"International Journal of Innovation in Mechanical Engineering and Advanced Materials","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Innovation in Mechanical Engineering and Advanced Materials","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52547/ijie.1.1.48","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage their efforts based on production management and project management practices; these kind of manufactures are known as project oriented manufacture. It is very important to manage and control manufacturing equipment project with the consideration of the constraints (time, cost, scope and quality). During the project’s lifecycle many risks take place, either positive or negative that should be controlled not to have a negative effect on quality of the project. With considering this concept, in this paper we will discuss a framework how to manage risks to eliminate negative effects on the quality of the project.
在面向项目的制造中管理投资组合的风险以提高质量
伊朗是一个发展中国家,有许多不同的基础设施项目。一些为石油、天然气和能源等基础设施项目生产设备的制造商应该根据生产管理和项目管理实践来管理他们的努力;这类制造被称为项目导向制造。考虑到时间、成本、范围和质量的约束,对制造设备项目进行管理和控制是非常重要的。在项目的生命周期中会发生许多风险,无论是积极的还是消极的,都应该加以控制,以免对项目的质量产生负面影响。考虑到这一概念,在本文中,我们将讨论如何管理风险以消除对项目质量的负面影响的框架。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
6
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书