Identifikasi Risiko pada Proyek Waste to Energy Melalui Kerjasama Pemerintah dengan Badan Usaha di Sumatera Barat

Sesmiwati Sesmiwati, W. P. Utama, Martalius Peli
{"title":"Identifikasi Risiko pada Proyek Waste to Energy Melalui Kerjasama Pemerintah dengan Badan Usaha di Sumatera Barat","authors":"Sesmiwati Sesmiwati, W. P. Utama, Martalius Peli","doi":"10.21776/ub.rekayasasipil.2022.016.02.7","DOIUrl":null,"url":null,"abstract":"Waste to energy (WTE) project is a solution to solve energy crisis and at the same time may resolve the waste problem. Public private partnership (PPP) scheme has been widely used to deliver WTE project. The success of PPP projects heavily relies on the advisability of management and risk sharing.  Risk management needed to conduct in order to understand specific risks, examine risk sharing between government and public sector and analyze risk mitigation for preventing and rectifying the impact. The effective decision on risk needed to improve decision-making process that may occur in the WTE projects. Therefore, this study identify risk probability in PPP WTE projects in West Sumatera. This probability relying on expert judgement were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 21 risk factors that impact the success of PPP WTE projects as gleaned from previous research. The overall result ranked risk probability factors that land acquisition and administration approval risk, public opposition, construction cost overrun, operating cost overrun, and design/construction/commissioning performance risk are the top five risk factors affecting the sustainable development of PPP WTE Projects. A better understanding of the risk may improve project feasibility and attract private sector for investing in WTE projects.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"43 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.02.7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Waste to energy (WTE) project is a solution to solve energy crisis and at the same time may resolve the waste problem. Public private partnership (PPP) scheme has been widely used to deliver WTE project. The success of PPP projects heavily relies on the advisability of management and risk sharing.  Risk management needed to conduct in order to understand specific risks, examine risk sharing between government and public sector and analyze risk mitigation for preventing and rectifying the impact. The effective decision on risk needed to improve decision-making process that may occur in the WTE projects. Therefore, this study identify risk probability in PPP WTE projects in West Sumatera. This probability relying on expert judgement were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 21 risk factors that impact the success of PPP WTE projects as gleaned from previous research. The overall result ranked risk probability factors that land acquisition and administration approval risk, public opposition, construction cost overrun, operating cost overrun, and design/construction/commissioning performance risk are the top five risk factors affecting the sustainable development of PPP WTE Projects. A better understanding of the risk may improve project feasibility and attract private sector for investing in WTE projects.
通过政府与西苏门答腊企业的合作,确定浪费能源项目的风险
垃圾发电项目是解决能源危机的一种方法,同时也可以解决垃圾问题。政府与私营机构合作的模式已被广泛应用于污水处理厂的工程项目。PPP项目的成功在很大程度上依赖于管理的合理性和风险分担。Â需要进行风险管理,以便了解具体风险,审查政府和公共部门之间的风险分担,并分析风险缓解措施,以预防和纠正影响。Â需要对风险进行有效决策,以改进WTE项目中可能发生的决策过程。因此,本研究确定了西苏门答腊PPP污水处理厂项目的风险概率。该概率依赖于专家判断,通过实证问卷调查收集。受访者被邀请对影响PPP WTE项目成功的21个风险因素进行评级,这些风险因素来自之前的研究。综合结果对风险概率因素进行了排序,土地征收和行政审批风险、公众反对、建设成本超支、运营成本超支、设计/施工/调试绩效风险是影响PPP污水处理项目可持续发展的前五大风险因素。更好地了解这种风险可以提高项目的可行性,并吸引私营部门投资于污水处理厂项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书