{"title":"Analysis of Doubly Fed Induction Generator-based wind turbine system for fault ride through capability investigations","authors":"M. Tuka, Salem Molla Endale","doi":"10.1177/0309524x231186762","DOIUrl":null,"url":null,"abstract":"A Doubly Fed Induction Generator has a stator winding directly coupled with grid whereas rotor is to the grid via a fault-prone converter. In early times, when a fault occurred, these generators were required to disengage from the grid. However, due to the increased penetration, grid operators demanded WTs remain connected to the grid. Thus, this paperwork integrates crowbar protection with a Battery Energy Storage System (BESS) to improve Fault Ride Through (FRT) capability. For performance evaluation under transient conditions, a three-phase symmetrical fault is imposed at a time of 2 seconds. By using the suggested technique, the DC-link voltage is observed to improve and remain at 1150 V with minor fluctuation. Likewise, the stator and rotor currents are observed to remain at their nominal value after 2.15 seconds. MATLAB-Simulink software is used for modeling and simulation by obtaining all the system’s actual parameters from ADAMA-II Wind Farm.","PeriodicalId":51570,"journal":{"name":"Wind Engineering","volume":"60 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2023-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Wind Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0309524x231186762","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0
Abstract
A Doubly Fed Induction Generator has a stator winding directly coupled with grid whereas rotor is to the grid via a fault-prone converter. In early times, when a fault occurred, these generators were required to disengage from the grid. However, due to the increased penetration, grid operators demanded WTs remain connected to the grid. Thus, this paperwork integrates crowbar protection with a Battery Energy Storage System (BESS) to improve Fault Ride Through (FRT) capability. For performance evaluation under transient conditions, a three-phase symmetrical fault is imposed at a time of 2 seconds. By using the suggested technique, the DC-link voltage is observed to improve and remain at 1150 V with minor fluctuation. Likewise, the stator and rotor currents are observed to remain at their nominal value after 2.15 seconds. MATLAB-Simulink software is used for modeling and simulation by obtaining all the system’s actual parameters from ADAMA-II Wind Farm.
期刊介绍:
Having been in continuous publication since 1977, Wind Engineering is the oldest and most authoritative English language journal devoted entirely to the technology of wind energy. Under the direction of a distinguished editor and editorial board, Wind Engineering appears bimonthly with fully refereed contributions from active figures in the field, book notices, and summaries of the more interesting papers from other sources. Papers are published in Wind Engineering on: the aerodynamics of rotors and blades; machine subsystems and components; design; test programmes; power generation and transmission; measuring and recording techniques; installations and applications; and economic, environmental and legal aspects.