Continuous Improvement: Rotary Steerable System with Electromagnetic Telemetry as Approach to Reduce Well Time

Farit Rakhmangulov, Pavel Dorokhin
{"title":"Continuous Improvement: Rotary Steerable System with Electromagnetic Telemetry as Approach to Reduce Well Time","authors":"Farit Rakhmangulov, Pavel Dorokhin","doi":"10.2118/206441-ms","DOIUrl":null,"url":null,"abstract":"\n One of the main challenges from operating companies is the continuous reduction of well construction time. During drilling, considerable time is spent on static measurements to determine the wellbore location and to verify that the actual well path matches the planned one. The electromagnetic telemetry system (EMT) allows the taking of static directional survey measurements during connections, when the drill string is in slips. Transmitting commands to the rotary steerable system (RSS) through the EMT does not cause the drilling process to stop, which also reduces well construction time.\n The work describes well drilling experience with the use of the electromagnetic channel for communication with the rotary steerable system and the positive displacement downhole motor not only in horizontal section but in all well sections, starting from the top hole. Combined use of the complete logging while drilling tools (LWD) with this type of the telemetry system is a valuable finding. The article describes BHA, operational principles of this type of the telemetry system, and problems which may arise during operation.","PeriodicalId":11177,"journal":{"name":"Day 4 Fri, October 15, 2021","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, October 15, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206441-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

One of the main challenges from operating companies is the continuous reduction of well construction time. During drilling, considerable time is spent on static measurements to determine the wellbore location and to verify that the actual well path matches the planned one. The electromagnetic telemetry system (EMT) allows the taking of static directional survey measurements during connections, when the drill string is in slips. Transmitting commands to the rotary steerable system (RSS) through the EMT does not cause the drilling process to stop, which also reduces well construction time. The work describes well drilling experience with the use of the electromagnetic channel for communication with the rotary steerable system and the positive displacement downhole motor not only in horizontal section but in all well sections, starting from the top hole. Combined use of the complete logging while drilling tools (LWD) with this type of the telemetry system is a valuable finding. The article describes BHA, operational principles of this type of the telemetry system, and problems which may arise during operation.
持续改进:采用电磁遥测技术的旋转导向系统可减少井作业时间
运营公司面临的主要挑战之一是不断缩短建井时间。在钻井过程中,需要花费大量时间进行静态测量,以确定井眼位置,并验证实际井眼轨迹与计划井眼轨迹是否匹配。电磁遥测系统(EMT)允许在连接过程中进行静态定向测量,当钻柱发生卡瓦时。通过EMT向旋转导向系统(RSS)发送指令不会导致钻井过程停止,这也减少了建井时间。该工作描述了使用电磁通道与旋转导向系统和正位移井下马达通信的钻井经验,不仅在水平段,而且在所有井段,从顶孔开始。将随钻测井工具(LWD)与这种类型的遥测系统结合使用是一项有价值的发现。本文介绍了井下钻具组合、此类遥测系统的工作原理以及在操作过程中可能出现的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信