Minimising Downtime During Multiple Valves Change Outs on Critical Gas Export Pipelines

Raja Zahirudin Raja Ismail, Wan Ahmad Izuddin Wan Dagang, Rolf Gunnar Lie
{"title":"Minimising Downtime During Multiple Valves Change Outs on Critical Gas Export Pipelines","authors":"Raja Zahirudin Raja Ismail, Wan Ahmad Izuddin Wan Dagang, Rolf Gunnar Lie","doi":"10.4043/31367-ms","DOIUrl":null,"url":null,"abstract":"\n To enable the safe replacement of five valves whose passing rates exceeded allowable limits, PETRONAS Carigali Sdn Bhd (PCSB) in 2017 used a three-module high pressure isolation tool (HPIT) to isolate one 24-inch and two 32-inch critical gas export pipelines at ANDR-A in the Angsi field in offshore Peninsular Malaysia. The SmartPlug® tool provided a double block and monitor (DBM) isolation without requiring depressurization or bleeding down the entire pipeline, which avoided prolonged shutdown. Because the three pipelines shared a common header at the ANDR-A topside, they required simultaneous isolation. Although HPIT had been deployed on main gas export pipelines several times before in Malaysia, this was the first time three isolations were required to be executed at the same time on the same platform during a single shutdown campaign. This Case Study describes the steps taken from planning, site visit and engineering to the safe and successful execution of the isolations.","PeriodicalId":11217,"journal":{"name":"Day 4 Fri, March 25, 2022","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, March 25, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31367-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To enable the safe replacement of five valves whose passing rates exceeded allowable limits, PETRONAS Carigali Sdn Bhd (PCSB) in 2017 used a three-module high pressure isolation tool (HPIT) to isolate one 24-inch and two 32-inch critical gas export pipelines at ANDR-A in the Angsi field in offshore Peninsular Malaysia. The SmartPlug® tool provided a double block and monitor (DBM) isolation without requiring depressurization or bleeding down the entire pipeline, which avoided prolonged shutdown. Because the three pipelines shared a common header at the ANDR-A topside, they required simultaneous isolation. Although HPIT had been deployed on main gas export pipelines several times before in Malaysia, this was the first time three isolations were required to be executed at the same time on the same platform during a single shutdown campaign. This Case Study describes the steps taken from planning, site visit and engineering to the safe and successful execution of the isolations.
最大限度地减少关键天然气出口管道上多个阀门更换期间的停机时间
为了安全更换合格率超过允许限值的5个阀门,马来西亚国家石油公司(PETRONAS Carigali Sdn Bhd, PCSB)在2017年使用了三模块高压隔离工具(HPIT),在马来西亚半岛Angsi海上油田的ANDR-A隔离了一条24英寸和两条32英寸的关键天然气出口管道。SmartPlug®工具提供了双封块和监测(DBM)隔离,无需减压或放血整个管道,避免了长时间的关闭。由于三根管线在ANDR-A上部共用一个集管,因此它们需要同时隔离。虽然HPIT之前在马来西亚的主要天然气出口管道上部署过几次,但这是第一次在同一平台上在一次关闭期间同时执行三个隔离。本案例研究描述了从规划,现场访问和工程到安全成功地执行隔离所采取的步骤。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信