{"title":"Application of operator error analysis in the design of Sizewell ‘B’","authors":"D.P.D. Whitworth","doi":"10.1016/0143-8174(87)90063-1","DOIUrl":null,"url":null,"abstract":"<div><p>A programme of operator error analysis is being carried out for the Sizewell ‘B’ PWR design. This paper describes the methods used, the analysis which has been carried out, preliminary results and design changes which have been incorporated to reduce the risk. At this stage, systematic identification and reduction of risk from operator error has been achieved. Further analysis and quantification of error is required to substantiate that the risk arising from operator error does not dominate the risk due to mechanical plant failures.</p></div>","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"19 4","pages":"Pages 299-316"},"PeriodicalIF":0.0000,"publicationDate":"1987-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0143-8174(87)90063-1","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Reliability Engineering","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0143817487900631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
A programme of operator error analysis is being carried out for the Sizewell ‘B’ PWR design. This paper describes the methods used, the analysis which has been carried out, preliminary results and design changes which have been incorporated to reduce the risk. At this stage, systematic identification and reduction of risk from operator error has been achieved. Further analysis and quantification of error is required to substantiate that the risk arising from operator error does not dominate the risk due to mechanical plant failures.
一个操作员误差分析程序正在为Sizewell ' B '压水堆设计进行。本文描述了所使用的方法,已进行的分析,初步结果和设计变更,已纳入减少风险。在这一阶段,系统地识别和降低了操作员错误带来的风险。需要对误差进行进一步的分析和量化,以证实由操作人员错误引起的风险并不占机械设备故障造成的风险的主要地位。