Managing uncertainty to deliver complex development wells

Peter J. van Ruth, M. Agarwal, Scott Gagen
{"title":"Managing uncertainty to deliver complex development wells","authors":"Peter J. van Ruth, M. Agarwal, Scott Gagen","doi":"10.1080/22020586.2019.12073106","DOIUrl":null,"url":null,"abstract":"Summary Managing seismic depth uncertainty is a key consideration in placing horizontal development wells into thin reservoir targets. Seismic depth uncertainty has the potential to erode project value through missed reservoir (late landing or reservoir exits) and/or the cost of corrective actions (e.g. sidetracks). The placement of Laverda Canyon development wells in 2018 utilised a 30 Hz full waveform inversion velocity model and deep directional resistivity data in combination with a near real-time depth update process to optimise well placement. Utilising these methods resulted in a significant reduction in seismic depth uncertainty which culminated in the final Laverda Canyon development well (LAV04WI) being successfully geosteered for ~ 2,200 m within a 10-15 m thick reservoir with only one reservoir exit.","PeriodicalId":8502,"journal":{"name":"ASEG Extended Abstracts","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEG Extended Abstracts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/22020586.2019.12073106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary Managing seismic depth uncertainty is a key consideration in placing horizontal development wells into thin reservoir targets. Seismic depth uncertainty has the potential to erode project value through missed reservoir (late landing or reservoir exits) and/or the cost of corrective actions (e.g. sidetracks). The placement of Laverda Canyon development wells in 2018 utilised a 30 Hz full waveform inversion velocity model and deep directional resistivity data in combination with a near real-time depth update process to optimise well placement. Utilising these methods resulted in a significant reduction in seismic depth uncertainty which culminated in the final Laverda Canyon development well (LAV04WI) being successfully geosteered for ~ 2,200 m within a 10-15 m thick reservoir with only one reservoir exit.
管理不确定性,交付复杂的开发井
控制地震深度的不确定性是水平井进入薄储层的关键考虑因素。地震深度的不确定性有可能通过错过储层(延迟着陆或储层退出)和/或纠正措施的成本(例如侧钻)来侵蚀项目价值。2018年,Laverda Canyon开发井的布置使用了30 Hz全波形反演速度模型和深部定向电阻率数据,并结合近实时深度更新过程来优化井的布置。利用这些方法大大降低了地震深度的不确定性,最终Laverda Canyon开发井(LAV04WI)在10-15米厚的储层中成功地进行了2200米的地质导向,只有一个储层出口。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信