T. Heu, Anson Wee, C. Combe, Razif Mohd-Radzi, Ting-Ting Zhang
{"title":"Structured Approach in Qualifying Cement Isolation Through the Use of Cementing Scorecard and Post-Job Execution Data","authors":"T. Heu, Anson Wee, C. Combe, Razif Mohd-Radzi, Ting-Ting Zhang","doi":"10.2118/192096-MS","DOIUrl":null,"url":null,"abstract":"\n Conventional ‘textbook’ primary cement job execution has always been associated with the combination of bumping top wiper plug, successful casing pressure test and/or no losses during the job. These criteria have been referenced by the general industry as positive indications and conveniently adopted as qualification for a successful cement job without considering other key parameters that contributes to proper cement isolation behind casing. In a deepwater development campaign offshore Malaysia, cement isolation behind the 9-5/8\" production casing serves as critical barrier to ensure well integrity throughout the production lifecycle. To achieve this, the authors have deployed a structured approach focused on designing for success and optimizing a set of key performance indicators (KPIs) with pre- and post-drilled hole conditions. This paper outlines the approach based on the experience from the drilling campaign of nine oil producer wells.","PeriodicalId":11240,"journal":{"name":"Day 1 Tue, October 23, 2018","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 23, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192096-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Conventional ‘textbook’ primary cement job execution has always been associated with the combination of bumping top wiper plug, successful casing pressure test and/or no losses during the job. These criteria have been referenced by the general industry as positive indications and conveniently adopted as qualification for a successful cement job without considering other key parameters that contributes to proper cement isolation behind casing. In a deepwater development campaign offshore Malaysia, cement isolation behind the 9-5/8" production casing serves as critical barrier to ensure well integrity throughout the production lifecycle. To achieve this, the authors have deployed a structured approach focused on designing for success and optimizing a set of key performance indicators (KPIs) with pre- and post-drilled hole conditions. This paper outlines the approach based on the experience from the drilling campaign of nine oil producer wells.