ANALISIS PENGHEMATAN BIAYA LISTRIK DI KANTOR DINAS KETENAGAKERJAAN DAN ESDM PROVINSI BALI PASCA TERPASANG PLTS ATAP 40 KWP

I. K. Adi Febriana Putra, I. A. Dwi Giriantari, I. W. Sukerayasa
{"title":"ANALISIS PENGHEMATAN BIAYA LISTRIK DI KANTOR DINAS KETENAGAKERJAAN DAN ESDM PROVINSI BALI PASCA TERPASANG PLTS ATAP 40 KWP","authors":"I. K. Adi Febriana Putra, I. A. Dwi Giriantari, I. W. Sukerayasa","doi":"10.24843/spektrum.2022.v09.i02.p16","DOIUrl":null,"url":null,"abstract":"PLN's electricity sales in 2020 reached 234.5 TWh, while electricity consumption in Bali Province throughout 2020 was 4.9 TWh. In this study, PLTS roof supporting parking at the Office of the Manpower and ESDM Office of the Province of Bali is used as a location for installing PLTS in the use of new and renewable energy which has an impact on saving electricity bills and reducing CO? emissions. PLTS is installed with a total capacity of 40 kWp with an on grid configuration. Based on the research results, the simulation uses HelioScope software using two scenarios. In scenario 1 with an optimal inclination angle of 14.79°, the potential for energy production is 59.251,00 kWh/year, while in scenario 2 with an optimal tilt angle of 6.35°, the potential for energy production is 59.251,00 kWh/year. PLTS production from June to December 2021 is 35,287.90 kWh with savings on electricity bill costs of Rp. 67,640,740.00 and is able to reduce total CO? gas emissions by 27,233.33 kg CO?.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"80 2 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i02.p16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PLN's electricity sales in 2020 reached 234.5 TWh, while electricity consumption in Bali Province throughout 2020 was 4.9 TWh. In this study, PLTS roof supporting parking at the Office of the Manpower and ESDM Office of the Province of Bali is used as a location for installing PLTS in the use of new and renewable energy which has an impact on saving electricity bills and reducing CO? emissions. PLTS is installed with a total capacity of 40 kWp with an on grid configuration. Based on the research results, the simulation uses HelioScope software using two scenarios. In scenario 1 with an optimal inclination angle of 14.79°, the potential for energy production is 59.251,00 kWh/year, while in scenario 2 with an optimal tilt angle of 6.35°, the potential for energy production is 59.251,00 kWh/year. PLTS production from June to December 2021 is 35,287.90 kWh with savings on electricity bill costs of Rp. 67,640,740.00 and is able to reduce total CO? gas emissions by 27,233.33 kg CO?.
在安装了40千克的屋顶PLTS后,巴厘岛劳动局和ESDM省的电力成本分析
2020年,PLN的电力销售达到234.5太瓦时,而巴厘岛省2020年全年的用电量为4.9太瓦时。在这项研究中,在巴厘岛省人力资源和ESDM办公室的办公室,PLTS屋顶支持停车场被用作安装PLTS的地点,使用新能源和可再生能源,这对节省电费和减少二氧化碳产生了影响。排放。PLTS的总容量为40 kWp,并网配置。在研究结果的基础上,利用HelioScope软件进行了两种场景的仿真。当最佳倾角为14.79°时,情景1的产能潜力为59.25.1万千瓦时/年;当最佳倾角为6.35°时,情景2的产能潜力为59.25.1万千瓦时/年。从2021年6月到12月,PLTS的产量为35,287.90千瓦时,节省电费成本为67,640,740.00卢比,并能够减少总CO?气体排放量减少27,233.33 kg CO?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信