{"title":"Automatic configuration of a powertrain assembly line layout based on a KBE approach","authors":"A. Ascheri, M. Ippolito, G. Colombo, F. Furini, E. Atzeni","doi":"10.1109/ETFA.2014.7005294","DOIUrl":null,"url":null,"abstract":"Design of assembly lines is a knowledge intensive process relying significantly on experience and associated with high costs, long lead times and high probability of risks and reworks. This paper presents a methodology to support the early stage design of assembly lines through Knowledge Based Engineering (KBE). In this introductory paper the authors discuss the methodology to implement the KBE approach. A set of system engineering rules is extracted from direct interviews and domain best practices and knowledge about product and process is formalized. These rules will be implemented in a user-friendly platform allowing the design of first phase line layout by taking the defined system requirements (e.g. cycle time) as input. Then, the KBE approach is extended to a specific case study taken from the powertrain sector.","PeriodicalId":20477,"journal":{"name":"Proceedings of the 2014 IEEE Emerging Technology and Factory Automation (ETFA)","volume":"53 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2014 IEEE Emerging Technology and Factory Automation (ETFA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETFA.2014.7005294","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Design of assembly lines is a knowledge intensive process relying significantly on experience and associated with high costs, long lead times and high probability of risks and reworks. This paper presents a methodology to support the early stage design of assembly lines through Knowledge Based Engineering (KBE). In this introductory paper the authors discuss the methodology to implement the KBE approach. A set of system engineering rules is extracted from direct interviews and domain best practices and knowledge about product and process is formalized. These rules will be implemented in a user-friendly platform allowing the design of first phase line layout by taking the defined system requirements (e.g. cycle time) as input. Then, the KBE approach is extended to a specific case study taken from the powertrain sector.
基于KBE方法的动力总成装配线布局自动配置
装配线的设计是一个知识密集型的过程,很大程度上依赖于经验,并且与高成本、长交货期、高风险和返工的高概率相关。本文提出了一种利用知识工程技术支持装配线早期设计的方法。在这篇介绍性的论文中,作者讨论了实现KBE方法的方法。一组系统工程规则是从直接访谈中提取出来的,领域最佳实践和关于产品和过程的知识是形式化的。这些规则将在一个用户友好的平台上实施,允许通过将定义的系统需求(例如周期时间)作为输入来设计第一期线路布局。然后,将KBE方法扩展到动力总成领域的具体案例研究中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信