Up-grading of the Strasbourg MP 10

M. Letournel, J.C. Oberlin, G. Heng
{"title":"Up-grading of the Strasbourg MP 10","authors":"M. Letournel,&nbsp;J.C. Oberlin,&nbsp;G. Heng","doi":"10.1016/0029-554X(81)90850-8","DOIUrl":null,"url":null,"abstract":"<div><p>The project consists essentially in replacing the standard 72 in. tube sections by new 88 in. tube sections taking advantage both of the protrusion of the electrostatic field towards the dead sections and of the room left there. A first new 88 in. tube section has been tested separately up to 4.6 MV and in normal MP running conditions for three months. After some difficulties with broken tube glasses, the tests of the total upgraded machine are planned for May and June 1980.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 67-71"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90850-8","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The project consists essentially in replacing the standard 72 in. tube sections by new 88 in. tube sections taking advantage both of the protrusion of the electrostatic field towards the dead sections and of the room left there. A first new 88 in. tube section has been tested separately up to 4.6 MV and in normal MP running conditions for three months. After some difficulties with broken tube glasses, the tests of the total upgraded machine are planned for May and June 1980.

升级斯特拉斯堡mp10
该项目主要包括替换标准的72英寸。管段由新的88英寸。管段利用了静电场向死区和在那里留下的空间的突出。第一个新的88英寸。管段分别在4.6 MV和正常MP运行条件下进行了三个月的测试。由于玻璃管破裂,在经历了一些困难之后,计划在1980年5月和6月对升级后的机器进行试验。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信