{"title":"Continuous Proportional Steering for a Re-Entry Multi-Lateral Well in Cretaceous Reservoir in UAE Saves Rig Days and Achieves Reservoir Contact Objectives in a One-Bit Run","authors":"Adeniyi Adams, A. Soliman, Lichuan Deng, Imad Jurdi, Mohamed Salem Al Hosani, Adnan Al Menhali, Jose David Cardona Ardila","doi":"10.2118/194818-MS","DOIUrl":null,"url":null,"abstract":"\n The challenge was to achieve more reservoir contact in a cretaceous tight reservoir to improve production and maximize recovery. Multilateral well campaigns were performed to meet these objectives.\n This case study describes an effective workflow for performing openhole sidetracks in this challenging medium-hard carbonate formation. The workflow maintained reservoir contact and achieved the desired production objectives.\n Two 6-in. multilateral drain sections were successfully drilled by performing openhole sidetrack using the continuous proportional steering method (CPSM). This method is not new to the industry, but this case study describes the systematic, unique workflow that was designed and followed to ensure a successful sidetrack in this low-porosity, hard formation.\n The sidetrack implementation started by creating humps at inclinations ranging from 88 to 91 degrees into the formation in the original 6-in. section. These humps were confirmed using near-bit inclination data (4.5 ft from the bit) and were identified as the sites for initiating a sidetrack. This paper discusses the best practices that were key to the successful execution of the project in one run on the first attempt.\n After the sidetrack, use of appropriate combinations of shallow and deep logging-while-drilling (LWD) measurements in the same bottom hole assembly (BHA) enabled the direct geosteering of the well, exposing more reservoir surface area than planned.\n A reduction of 10% from the planned well duration was achieved. Two 6-in. laterals, each approximately 4000 ft, were drilled in a single run and 100% reservoir contact was achieved.\n This experience proved that planning and precise execution could enable drilling of openhole sidetracks, even through hard formations. These sidetracks can then achieve fishbone wells with desired reservoir contact and realize the field development objectives in a technically robust and cost-efficient manner.\n CPSM does not rely on a pressure drop for steering. Although this proof of concept was performed in a relatively hard formation, similar workflows with appropriate drilling engineering may be applied to less-competent formations as well. The detailed procedure and flowchart created from the experience with the sample well can be adopted for use in similar applications.","PeriodicalId":11031,"journal":{"name":"Day 4 Thu, March 21, 2019","volume":"78 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, March 21, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194818-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The challenge was to achieve more reservoir contact in a cretaceous tight reservoir to improve production and maximize recovery. Multilateral well campaigns were performed to meet these objectives. This case study describes an effective workflow for performing openhole sidetracks in this challenging medium-hard carbonate formation. The workflow maintained reservoir contact and achieved the desired production objectives. Two 6-in. multilateral drain sections were successfully drilled by performing openhole sidetrack using the continuous proportional steering method (CPSM). This method is not new to the industry, but this case study describes the systematic, unique workflow that was designed and followed to ensure a successful sidetrack in this low-porosity, hard formation. The sidetrack implementation started by creating humps at inclinations ranging from 88 to 91 degrees into the formation in the original 6-in. section. These humps were confirmed using near-bit inclination data (4.5 ft from the bit) and were identified as the sites for initiating a sidetrack. This paper discusses the best practices that were key to the successful execution of the project in one run on the first attempt. After the sidetrack, use of appropriate combinations of shallow and deep logging-while-drilling (LWD) measurements in the same bottom hole assembly (BHA) enabled the direct geosteering of the well, exposing more reservoir surface area than planned. A reduction of 10% from the planned well duration was achieved. Two 6-in. laterals, each approximately 4000 ft, were drilled in a single run and 100% reservoir contact was achieved. This experience proved that planning and precise execution could enable drilling of openhole sidetracks, even through hard formations. These sidetracks can then achieve fishbone wells with desired reservoir contact and realize the field development objectives in a technically robust and cost-efficient manner. CPSM does not rely on a pressure drop for steering. Although this proof of concept was performed in a relatively hard formation, similar workflows with appropriate drilling engineering may be applied to less-competent formations as well. The detailed procedure and flowchart created from the experience with the sample well can be adopted for use in similar applications.
阿联酋白垩纪油藏多分支井的连续比例转向技术节省了钻机日数,并在一钻头的下入中实现了油藏接触目标
挑战在于如何在白垩纪致密储层中实现更大的储层接触,以提高产量并最大限度地提高采收率。为了实现这些目标,进行了多井作业。本案例描述了在具有挑战性的中硬碳酸盐地层中进行裸眼侧钻的有效工作流程。该工作流程保持了油藏接触,实现了预期的生产目标。两个6。通过使用连续比例转向法(CPSM)进行裸眼侧钻,成功钻出了多侧泄水管段。这种方法对行业来说并不新鲜,但本案例研究描述了系统的、独特的工作流程,以确保在这种低孔隙度、坚硬的地层中成功实现侧钻。在最初的6-in井眼中,侧钻首先在地层中形成88 ~ 91度的斜面。部分。这些隆起是通过近钻头倾角数据(距钻头4.5英尺)确认的,并被确定为启动侧钻的位置。本文讨论了在第一次尝试时成功执行项目的关键最佳实践。侧钻完成后,在同一个底部钻具组合(BHA)中,适当组合使用浅井和深井随钻测井(LWD)测量,实现了井的直接地质导向,暴露出比计划更多的储层表面积。与计划的井工期相比,缩短了10%。两个6。水平井段每段约4000英尺,一次下钻即可达到100%接触油藏。这一经验证明,规划和精确的执行可以实现裸眼侧钻,甚至可以穿过坚硬的地层。然后,这些侧道可以实现具有理想储层接触的鱼骨井,并以技术可靠且经济高效的方式实现油田开发目标。CPSM不依赖于压降进行转向。虽然这一概念验证是在相对较硬的地层中进行的,但类似的工作流程和适当的钻井工程也可以应用于较硬的地层。根据样品井的经验创建的详细程序和流程图可用于类似的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信