Factors Contributing to Delay of Interim Payment in Civil Engineering Projects

IF 1.4 4区 管理学 Q2 ENGINEERING, MULTIDISCIPLINARY
W. Ismail, H. Adnan, Wan Mohd Azmi, N. Yusop, S. S. M. Isa
{"title":"Factors Contributing to Delay of Interim Payment in Civil Engineering Projects","authors":"W. Ismail, H. Adnan, Wan Mohd Azmi, N. Yusop, S. S. M. Isa","doi":"10.14716/ijtech.v14i4.3370","DOIUrl":null,"url":null,"abstract":". Delay of interim payment remains a chronic problem in the Malaysian construction industry and has relatively increased in number in recent years. Other than causing conflict among the contracting parties, the impacts it brings could shatter the entire delivery chain. Thus, the unfavorable contractual behavior of the client is a matter of great concern that should be addressed by all parties involved to ensure satisfactory project performance. However, research has revealed that the factor causing it is not solely because of the client's faults but also caused by other factors. Therefore, the purpose of this research is to determine the factors that lead to the occurrence of delay of interim payment in government-initiated civil engineering projects in Malaysia. The perceptions of civil engineer consultants and contractors were compared in relation to a list of factors derived from the literature review. The data were collected through an industry-wide questionnaire survey from 288 respondents. This research developed a list of 22 items that might influence the delay of interim payment based on four domains, namely project characteristics, quality of Standard Form of Contract (SFoC), external factors and participants and local attitude. The results found that the occurrence of delay of interim payment in civil engineering project is very high frequency. Correlation analysis performed revealed that the three major factors are positively correlated, namely project scope and design changes, ground uncertainty under the project characteristics domain, and bureaucracy in government agencies under the participants and local attitude domain. These results can help the project participants to better understand the relationship between the groups of factors and the delay of interim payment and encourage them to find solutions or implement mitigating actions to improve the outcomes of civil engineering project.","PeriodicalId":50285,"journal":{"name":"International Journal of Technology Management","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Technology Management","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.14716/ijtech.v14i4.3370","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

. Delay of interim payment remains a chronic problem in the Malaysian construction industry and has relatively increased in number in recent years. Other than causing conflict among the contracting parties, the impacts it brings could shatter the entire delivery chain. Thus, the unfavorable contractual behavior of the client is a matter of great concern that should be addressed by all parties involved to ensure satisfactory project performance. However, research has revealed that the factor causing it is not solely because of the client's faults but also caused by other factors. Therefore, the purpose of this research is to determine the factors that lead to the occurrence of delay of interim payment in government-initiated civil engineering projects in Malaysia. The perceptions of civil engineer consultants and contractors were compared in relation to a list of factors derived from the literature review. The data were collected through an industry-wide questionnaire survey from 288 respondents. This research developed a list of 22 items that might influence the delay of interim payment based on four domains, namely project characteristics, quality of Standard Form of Contract (SFoC), external factors and participants and local attitude. The results found that the occurrence of delay of interim payment in civil engineering project is very high frequency. Correlation analysis performed revealed that the three major factors are positively correlated, namely project scope and design changes, ground uncertainty under the project characteristics domain, and bureaucracy in government agencies under the participants and local attitude domain. These results can help the project participants to better understand the relationship between the groups of factors and the delay of interim payment and encourage them to find solutions or implement mitigating actions to improve the outcomes of civil engineering project.
土木工程项目中期付款延迟的影响因素
。中期付款延迟仍然是马来西亚建筑业的一个长期问题,近年来数量相对增加。它所带来的影响除了会在缔约方之间造成冲突外,还可能会破坏整个配送链。因此,客户的不利合同行为是一个非常值得关注的问题,所有相关方都应该解决这个问题,以确保令人满意的项目绩效。然而,研究表明,造成这种情况的因素并不仅仅是因为客户的错误,还有其他因素造成的。因此,本研究的目的是确定导致马来西亚政府发起的土木工程项目中出现中期付款延迟的因素。土木工程顾问和承包商的看法进行了比较,关系到从文献综述中得出的一系列因素。这些数据是通过对288名受访者进行全行业问卷调查收集的。本研究根据项目特征、标准合同格式(Standard Form of Contract, SFoC)质量、外部因素和参与者、当地态度四个领域,列出了可能影响中期付款延迟的22个项目。结果发现,土木工程项目中期付款拖欠的发生频率很高。相关分析显示,项目范围与设计变更、项目特征域下的地面不确定性、参与者与地方态度域下的政府机构官僚主义三个主要影响因素正相关。这些结果可以帮助项目参与者更好地了解因素组与中期付款延迟之间的关系,并鼓励他们寻找解决方案或实施缓解措施,以改善土木工程项目的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Technology Management
International Journal of Technology Management 管理科学-工程:综合
CiteScore
2.70
自引率
3.60%
发文量
45
审稿时长
6-12 weeks
期刊介绍: The IJTM aims to provide a refereed and authoritative source of information in the field of managing with technology, and the management of engineering, science and technology. It seeks to establish channels of communication between government departments, technology executives in industry, commerce and related business, and academic experts in the field.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信