S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel
{"title":"Importance of representative metallurgical sampling and testwork programmes to reduce project risk – a gold case study","authors":"S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel","doi":"10.1080/25726668.2019.1628462","DOIUrl":null,"url":null,"abstract":"ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"20 1","pages":"230 - 245"},"PeriodicalIF":1.8000,"publicationDate":"2019-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2019.1628462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 4
Abstract
ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.