INVESTIGASI FAKTOR PENYEBAB COST OVERRUN OLEH KONTRAKTOR PADA PROYEK JALAN APBD KABUPATEN KARANGANYAR TAHUN 2017 DAN 2018

M. Sahid, Niza Widiana
{"title":"INVESTIGASI FAKTOR PENYEBAB COST OVERRUN OLEH KONTRAKTOR PADA PROYEK JALAN APBD KABUPATEN KARANGANYAR TAHUN 2017 DAN 2018","authors":"M. Sahid, Niza Widiana","doi":"10.32497/WAHANATS.V26I1.2645","DOIUrl":null,"url":null,"abstract":"The rapid development of road project development cannot be separated from the cost problem which often experiences cost overrun. This swelling can occur if a project management and control is not going well and does not meet the project target. The study was conducted to see the dominant factors that caused the cost overrun by the contractor for the implementation of the Karanganyar District Budget in Central Java Province which took place in 2017 and 2018, by distributing questionnaires to contractors. The results of the respondents collected were 36 respondents with 27 respondents. The questionnaire was processed by data processing using the SPSS (Statistical Package for Social Sciences) version 25 program. Reliability testing of 36 questionnaires showed that there were three unreliable questionnaires. In addition, the validity results of several variables in the questionnaire were obtained, namely one invalid variable. In addition to the validity and reliability tests, parametric statistical tests and multiple linear analysis were also carried out, then the results of the dominant factors that led to the implementation of Cost Overrun were schedule due to the influence of weather, disasters, poor cost control, not taking into account unexpected costs, and interest rates. bank loans, as well as the proportion of dominant cost overruns that occurs between 1% -5%","PeriodicalId":34836,"journal":{"name":"Prokons","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Prokons","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32497/WAHANATS.V26I1.2645","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The rapid development of road project development cannot be separated from the cost problem which often experiences cost overrun. This swelling can occur if a project management and control is not going well and does not meet the project target. The study was conducted to see the dominant factors that caused the cost overrun by the contractor for the implementation of the Karanganyar District Budget in Central Java Province which took place in 2017 and 2018, by distributing questionnaires to contractors. The results of the respondents collected were 36 respondents with 27 respondents. The questionnaire was processed by data processing using the SPSS (Statistical Package for Social Sciences) version 25 program. Reliability testing of 36 questionnaires showed that there were three unreliable questionnaires. In addition, the validity results of several variables in the questionnaire were obtained, namely one invalid variable. In addition to the validity and reliability tests, parametric statistical tests and multiple linear analysis were also carried out, then the results of the dominant factors that led to the implementation of Cost Overrun were schedule due to the influence of weather, disasters, poor cost control, not taking into account unexpected costs, and interest rates. bank loans, as well as the proportion of dominant cost overruns that occurs between 1% -5%
公路工程开发的快速发展离不开成本问题,经常出现成本超支的情况。如果项目管理和控制进展不顺利,没有达到项目目标,就会出现这种膨胀。通过向承包商分发调查问卷,进行了这项研究,以了解导致承包商在2017年和2018年实施中爪哇省Karanganyar地区预算的成本超支的主要因素。收集到的回答者的结果为36名回答者和27名回答者。问卷采用SPSS (Statistical Package for Social Sciences)第25版程序进行数据处理。对36份问卷进行信度检验,发现有3份问卷不可靠。另外,得到了问卷中多个变量的效度结果,即1个无效变量。除效度和信度检验外,还进行了参数统计检验和多元线性分析,得出导致成本超支的主导因素为天气、灾害影响的进度、成本控制不佳、未考虑意外成本和利率。银行贷款,以及占主导地位的成本超支的比例在1% -5%之间
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
6
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信