{"title":"养老房地产项目风险识别与分析","authors":"玥芹 王","doi":"10.18686/bd.v2i10.1765","DOIUrl":null,"url":null,"abstract":"房地产项目由于运作时间长、资金投入量大等特点在开发建设的过程中存在诸多不可控的不确定因素,政策、市场、技术、进度等方面都存在很大的变数,现利用前期搜集数据以及拟采用的可行性研究方案,利用SWOT分析法和专家评估法,对我公司在建项目进行风险识别及分析。","PeriodicalId":63895,"journal":{"name":"商品与质量·建筑与发展","volume":"68 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"商品与质量·建筑与发展","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.18686/bd.v2i10.1765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
养老房地产项目风险识别与分析
房地产项目由于运作时间长、资金投入量大等特点在开发建设的过程中存在诸多不可控的不确定因素,政策、市场、技术、进度等方面都存在很大的变数,现利用前期搜集数据以及拟采用的可行性研究方案,利用SWOT分析法和专家评估法,对我公司在建项目进行风险识别及分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。