The Effect of Coastal Dike and Retention Pond Performance on Flood and Tidal Control in Pekalongan

Adhitya Gilang Irawanto, Joko Nugroho, Adi Prasetyo
{"title":"The Effect of Coastal Dike and Retention Pond Performance on Flood and Tidal Control in Pekalongan","authors":"Adhitya Gilang Irawanto, Joko Nugroho, Adi Prasetyo","doi":"10.5614/jts.2023.30.2.1","DOIUrl":null,"url":null,"abstract":"Abstract.Pekalongan is one of the areas located in the north of Java Island. The main problem in Pekalongan is tidalflooding. This tidal flood worsens when there is a high discharge in the river. For this reason, the government builta Coastal Dike and a Retention Pond to overcome these problems. The concept of this system is to create a coastaldike that crosses the river to eliminate tidal effects. The retention pond is located along the coastal dike toaccommodate the discharge from the river, then the water will be pumped downstream of the river. This study aimsto obtain pump operating time for each pump built in this system to reduce the flood elevation of Q25 to – 0.5 m inthe retention pond. One dimensional flow modeling was used in the approach with the Hydrologic EngineeringCenter-River Analysis System (HEC-RAS) 6.0 model. This research shows that the pump operating time for theSilempeng and Sengkarang pumps is 150 hours. The addition of Mrican pumps and flap gates can reduce pumpoperating time to support the success of Coastal Dike and Retention Ponds in controlling floods and tidal inPekalongan.Keywords: Tidal flood, coastal dike, retention pond, pump. \nAbstrak.Pekalongan merupakan salah satu daerah yang terletak di utara Pulau Jawa. Masalah utama di Pekalonganadalah banjir rob. Banjir rob ini semakin parah ketika terjadi debit yang tinggi di aliran sungai. Untuk itupemerintah membangun tanggul rob dan kolam retensi untuk mengatasi permasalahan tersebut. Konsep sistem iniadalah membuat tanggul rob yang melintang sungai, menghalangi backwater dari laut untuk menghilangkan efekpasang surut. Kolam retensi terletak di sepanjang tanggul rob untuk menampung debit dari sungai, kemudian airakan dipompa ke arah hilir sungai. Tujuan dari penelitian ini adalah mendapatkan waktu operasional pompa untukmasing-masing pompa yang terbangun di sistem ini dalam menurunkan elevasi banjir Q25 sampai dengan elevasi –0,5 m di kolam retensi. Di dalam penelitian ini juga dilihat waktu operasional pompa setelah penambahan pompamrican dan pintu klep di Mrican. Pemodelan satu aliran dimensi dilakukan dengan model HEC-RAS 6.0. Hasil daripenelitian ini adalah waktu operasional pompa untuk pompa silempeng dan sengkarang adalah 150 jam.Penambahan pompa Mrican dan pintu klep dapat mengurangi waktu operasi pompa untuk mendukungkeberhasilan Tanggul Pesisir dan Kolam Retensi dalam pengendalian banjir dan pasang surut di Pekalongan. \nKata-kata Kunci: Banjir rob, tanggul rob, kolam retensi, pompa.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5614/jts.2023.30.2.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract.Pekalongan is one of the areas located in the north of Java Island. The main problem in Pekalongan is tidalflooding. This tidal flood worsens when there is a high discharge in the river. For this reason, the government builta Coastal Dike and a Retention Pond to overcome these problems. The concept of this system is to create a coastaldike that crosses the river to eliminate tidal effects. The retention pond is located along the coastal dike toaccommodate the discharge from the river, then the water will be pumped downstream of the river. This study aimsto obtain pump operating time for each pump built in this system to reduce the flood elevation of Q25 to – 0.5 m inthe retention pond. One dimensional flow modeling was used in the approach with the Hydrologic EngineeringCenter-River Analysis System (HEC-RAS) 6.0 model. This research shows that the pump operating time for theSilempeng and Sengkarang pumps is 150 hours. The addition of Mrican pumps and flap gates can reduce pumpoperating time to support the success of Coastal Dike and Retention Ponds in controlling floods and tidal inPekalongan.Keywords: Tidal flood, coastal dike, retention pond, pump. Abstrak.Pekalongan merupakan salah satu daerah yang terletak di utara Pulau Jawa. Masalah utama di Pekalonganadalah banjir rob. Banjir rob ini semakin parah ketika terjadi debit yang tinggi di aliran sungai. Untuk itupemerintah membangun tanggul rob dan kolam retensi untuk mengatasi permasalahan tersebut. Konsep sistem iniadalah membuat tanggul rob yang melintang sungai, menghalangi backwater dari laut untuk menghilangkan efekpasang surut. Kolam retensi terletak di sepanjang tanggul rob untuk menampung debit dari sungai, kemudian airakan dipompa ke arah hilir sungai. Tujuan dari penelitian ini adalah mendapatkan waktu operasional pompa untukmasing-masing pompa yang terbangun di sistem ini dalam menurunkan elevasi banjir Q25 sampai dengan elevasi –0,5 m di kolam retensi. Di dalam penelitian ini juga dilihat waktu operasional pompa setelah penambahan pompamrican dan pintu klep di Mrican. Pemodelan satu aliran dimensi dilakukan dengan model HEC-RAS 6.0. Hasil daripenelitian ini adalah waktu operasional pompa untuk pompa silempeng dan sengkarang adalah 150 jam.Penambahan pompa Mrican dan pintu klep dapat mengurangi waktu operasi pompa untuk mendukungkeberhasilan Tanggul Pesisir dan Kolam Retensi dalam pengendalian banjir dan pasang surut di Pekalongan. Kata-kata Kunci: Banjir rob, tanggul rob, kolam retensi, pompa.
北卡隆岸海岸堤防和蓄塘性能对防洪和潮汐控制的影响
摘要贝加隆岸是位于爪哇岛北部的地区之一。贝加隆岸的主要问题是潮汐泛滥。当河水流量大时,这种潮汐洪水就会恶化。为此,政府修建了海岸堤防和蓄水池来克服这些问题。这个系统的概念是建立一个横跨河流的海岸堤防,以消除潮汐的影响。蓄水池位于沿海堤防,以容纳河流的排放,然后将水泵往下游。本研究的目的是获得该系统中每台泵的运行时间,将Q25的蓄水池洪水标高降低至- 0.5 m。该方法采用水文工程中心-河流分析系统(HEC-RAS) 6.0模型进行一维流动建模。研究表明,silempeng和Sengkarang泵的运行时间为150小时。美国水泵和闸门的增加可以减少水泵的运行时间,以支持海岸堤防和保留池塘在控制北卡隆岸的洪水和潮汐方面的成功。关键词:潮汐洪水;海岸堤防;蓄水池;Abstrak。在爪哇岛,北卡隆岸的merupakan salah satu daerah yang terletak di爪哇岛。Masalah utama di Pekalonganadalah banjir rob。Banjir rob ini semakin parah ketika terjadi debit yang tinggi di aliiran sungai。Untuk itupemintah成员bangun tanggul rob dan kolam retensi Untuk mengatasi permasalahan tersebut。康斯普系统成员唐家乐抢劫杨梅林堂,孟哈兰吉回水达里劳,孟哈兰坎efekpasang surut。Kolam retensi terletak di sepanjang tanggul rob untuk menamung - dardari sungai, kemudian airakan dipompa ke arah hilir sungai。Tujuan dari penelitian ini adalah mendapatkan waktu操作pompa untukmasing-masing pompa yang terbangun di system ini dalam menurunkan elevasi banjir Q25 sampai dengan elevasi - 0,5 m di kolam retensi。我的意思是,我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思。模型为HEC-RAS 6.0。Hasil daripenelitian ini adalah waktu操作pompa untuk pompa silempeng dan sengkarang adalah 150 jam。Penambahan pompa Mrican丹pintu klep dapat mengurangi waktu operasi pompa为她mendukungkeberhasilan Tanggul Pesisir丹Kolam Retensi dalam pengendalian banjir丹帕surut di北加浪岸。Kata-kata Kunci: Banjir rob, tanggul rob, kolam retensi, pompa。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信